Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 743 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
10 Year Planning permission for a solar farm with a total area of circa 9 hectares. The solar farm will consist of solar panels on ground mounted frames, 2 no. single storey electrical inverter/transformer stations, 2 no. containerised energy storage modules, 1 no. single storey spare parts container, 1 no. medium voltage control/switching substation (comprising either single-storey building or 2 no. modular units), 1 no. weather station, underground electrical ducting and cabling within the development site, security fencing, CCTV, access tracks, temporary construction compound, landscaping and all associated ancillary development and drainage works. Construction and operational access will be via 1 no. existing entrance from the L7247. The operational lifespan of the solar farm will be 40 years and planning permission is requested for the duration.
Permission for upgrading of the existing wastewater treatment system to include a new final effluent pump station after the existing waste water treatment unit and to install a soil polishing filter and associated site works and Retention of a) dwelling as constructed (change of plan to that permitted under Planning Reference No. 02/4202, b) Retention of a detached domestic workshop/garden store building and c) all ancillary works.
Permission for Retention and completion of an existing dwelling house, treatment plant, associated site works and services.
A dwelling house, treatment plant, associated site works and services.
Retention of two timber domestic storage sheds, well and associated site works and services.
Dwellinghouse, treatment plant, associated site works and services
The brief summarizes the pattern across all 743 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 25/4167The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief