Applications tied to the site
Partial coverage14 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
14 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 606 decisions within 5 km, 14 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
14 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
14 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Retention permission for a) the change of use of the original building from warehouse and offices to a safety training centre, b) provision of thirteen containers for use in association with the safety training centre, c) construction of two links located to the east of the building connecting the building to two containers, d) provision of plant used for the purposes of safety training including water tank with pump house, LPG tanks and a fire training platform and e) other ancillary development including above door signage, fencing and gates. Permission for the construction of a bike shelter storage and other ancillary development, including the provision of EV parking along with additional landscaping
Permission for retention of development which consists of the construction of a single-storey coffee kiosk with drive-thru; internal covered seating area, part covered external patio area, and external seating area, signage, boundary fencing, soakaway, and all associated site works
Retirement of the existing 38kV substation to include demolition of the existing 4.1m x 4.1m control hut and removal of existing transformers, 38 kV and medium voltage (MV) busbars and other items of plant.
Re-development works, namely 1) construction of an artificial grass playing pitch, 2) reorientation of the existing natural grass playing pitch, 3) new site fencing, 4) new floodlighting (6 no. @ 15m high), 5) associated site works
The development of an 110kV substation at the former Mitsui Denman site. The proposed substation will comprise of: a two-storey Gas Insulated Switcher (GIS) 110/20kV substation building, an associated single storey Gas Insulated Switchgear (GIS) 20kV substation building, associated outdoor electrical equipment, including filter banks, transformers, cable sealing ends and surge arresters, two number lightning protection masts (12.5 metres in height), associated internal access road, boundary treatment including substation perimeter fencing and all ancillary site development works. Construction of two number 110kV underground cable ducts between the proposed substation and the existing Eirgrid 110kV substation to the North in Wallingstown. The site area of the proposed substation is approximately 0.60ha. The proposed substation is to support development in the Wallingstown area in Little Island. - Extension of duration of permission granted under planning reference: 16/5606.
Permission for redevelopment works, Namely 1) construction of an artificial grass playing pitch, 2) proposed new ball stop fencing, 3) proposed new floodlighting (2 no. @ 18.3m high and 4 no. @ 8.5m high), 4) extension to existing car park area with gated access to proposed artificial pitch, 5) associated site works
The brief summarizes the pattern across all 606 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 25/5059The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief