Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 722 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for amendments to previously granted planning permission (planning reference no. 22/6627) consisting of a change to part of the permitted site layout as per the following: A) The omission of apartment block no. 4 and house numbers 198 & 199 and their replacement with 4 no. Maisonette apartment units and 7 no. 3 & 4 bedroom housing units. B) The omission of house no.' s 185 - 192 inclusive and their replacement by a 3-storey apartment block containing 15 apartment units. C) Minor modifications to the site layout for 19 no. houses, no.' s 171 to 184 and no.' s 193 to 197 inclusive. D) The provision of a retaining landscape structure to the eastern boundary. E) The provision of a subterranean water attenuation tank. F) Minor alterations to permitted roadways and services infrastructure, and G) To carry out all associated site development works.
Permission to construct a temporary creche facility on the footprint of house no’s 131 & 132, and to carry out all associated site development works, including the minor alteration of parking layout and modification to footpaths, of development permitted under planning application no. 22/06627.
A ten-year planning permission for the following Large Scale Residential development comprising the construction of 330 no. residential units (199 no. 3 and 4-bed dwelling houses and 131 no. 2 bed apartment units). 136 no. dwelling houses will have the option to include side ground floor windows. The 131 no. apartments are arranged in 11 no. two-storey buildings, 4 no. three-storey buildings and 1 no. four-storey neighbourhood centre building which includes a creche, retail unit, medical centre, pharmacy and café at ground floor level. All associated ancillary development works including footpaths, pedestrian and cycle lanes, car and bicycle parking, drainage, bin storage, lighting, landscaping and amenity areas. Access to the site will be via a new vehicular access point on to the permitted services link corridor to be delivered under the local infrastructure housing activation fund. A Natura Impact Statement is submitted to the planning authority with this application. The Natura Impact Statement will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the offices of the planning authority.
Permission for carwash facility comprising of 1) automatic rollover carwash unit complete with side-screens, 2) pressure-jet carwash facility with enclosure building over, 3) 10,000-litre underground water storage tank, 4) carwash pump room for water-treatment facilities, water pumps and compressor unit, at service station complex previously approved under planning files ref. no's 19/5870 and 25/4142
A service station development and new access road to the existing industrial complex (Phases 1 & 2 of a 3-phase masterplan development of subject lands). The proposed development includes (1) Phase 1 – provision of new access road to service existing industrial estates and relocation of existing ESB substation; (2) Phase 2 – construction of new two-storey forecourt building with 100sq.m retail shop, 76.51sq.m restaurant food prep area with 5.35sq.m drive-thru facility, 30.28sq.m deli food prep area, 112.26sq.m seating area including 7.32sq.m barista unit, plus offices, stores & toilet facilities at ground and first floor levels; (3) construction of forecourt layout including 4no. fuel pumps and canopy over to service cars and LCV’s, separated 1no. hi-speed fuel pump and canopy over to service HGV’s (with dedicated access lane) and 4 no. underground fuel storage tanks, (4) sale of specially prepared hot & cold food for consumption both on and off the premises from the restaurant/drive thru/deli food areas of forecourt building; (5) ancillary signage for development, both illuminated and non-illuminated; (6) all associated site works including bin compound and (7) boundary adjustments to tie in with council proposed services corridor link road. Phase 3 of the masterplan development will be subject of a separate planning application. Extension of Duration to Permission granted under Planning Ref. No. 19/5870
A service station development and new access road to the existing industrial complex (Phases 1 & 2 of a 3-phase masterplan development of subject lands). The proposed development includes (1) Phase 1 – provision of new access road to service existing industrial estates and relocation of existing ESB substation; (2) Phase 2 – construction of new two-storey forecourt building with 100sq.m retail shop, 76.51sq.m restaurant food prep area with 5.35sq.m drive-thru facility, 30.28sq.m deli food prep area, 112.26sq.m seating area including 7.32sq.m barista unit, plus offices, stores & toilet facilities at ground and first floor levels; (3) construction of forecourt layout including 4no. fuel pumps and canopy over to service cars and LCV’s, separated 1no. hi-speed fuel pump and canopy over to service HGV’s (with dedicated access lane) and 4 no. underground fuel storage tanks, (4) sale of specially prepared hot & cold food for consumption both on and off the premises from the restaurant/drive thru/deli food areas of forecourt building; (5) ancillary signage for development, both illuminated and non-illuminated; (6) all associated site works including bin compound and (7) boundary adjustments to tie in with council proposed services corridor link road. Phase 3 of the masterplan development will be subject of a separate planning application.
The brief summarizes the pattern across all 722 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 25/6447The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief