2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 265 decisions within 5 km, 2 exact-site or onsite candidate records, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCTION OF A NEW DWELLING WITH INTEGRATED GARAGE AND WASTE WATER TREATMENT SYSTEM AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
ERECTION OF A DWELLING HOUSE WITH DOMESTIC GARAGE AND SEPTIC TANK SYSTEM WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS
(1) RETENTION OF SEPTIC TANK AND PERCOLATION AREA AND (2) RENOVATION AND EXTENSION OF EXISTING ONE AND HALF STOREY DWELLING TO INCLUDE SPLIT LEVEL EXTENSION TO REAR, CHANGE OF EXISTING ROOF MATERIAL AND ALL ASSOCIATED SITE WORKS
ERECTION OF A DWELLING HOUSE WITH DOMESTIC GARAGE AND THE INSTALLATION OF A SEPTIC TREATMENT SYSTEM WITH ASSOCIATED DRAINAGE/PERCOLATION AREA AND SITE WORKS
INSTALLATION OF A 12-METRE HIGH STOUT WOODEN POLE SUPPORTING 2 NO. RADIO-LINK DISHES, TOGETHER WITH EQUIPMENT CABINET, ENCLOSING FENCE AND GATE, FIBRE DUCTING AND CHAMBERS, FOUNDATION AND ALL ASSOCIATED ANCILLARY DEVELOPMENT WORKS INCLUDING A WALKWAY FROM THE EXISTING JETTY TO THE ELECTRONIC COMMUNICATIONS SITE. THE DEVELOPMENT IS REQUIRED TO CARRY THE BROADBAND DATA FROM THE NEW HIGH SPEED FIBRE BROADBAND NETWORK ON THE ISLAND, TO THE MAINLAND BY RADIO LINK, TO CONNECT TO THE NBI NATIONAL FIBRE NETWORK, AS PART OF THE GOVERNMENT’S NATIONAL BROADBAND PLAN TO PROVIDE HIGH SPEED BROADBAND TO ALL PARTS OF THE COUNTRY THAT ARE NOT AVAILABLE COMMERCIALLY, INCLUDING THE ISLANDS, AT THE SAME DATA SPEED
CONSTRUCTION OF A NEW DWELLING HOUSE AND INSTALLATION OF A WASTEWATER TREATMENT SYSTEM WITH ALL ASSOCIATED DRAINAGE AND SITE WORKS
The brief summarizes the pattern across all 265 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 1950608The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.