Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 32 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(A) DEMOLITION OF SUBSTRUCTURE REMAINS OF FORMER COTTAGE AND (B) CONSTRUCTION OF NEW SINGLE STOREY COTTAGE, SEPTIC TANK/SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS
1 NO. AGRICULTURAL SLATTED SHED AND 1 NO. AGRICULTURAL DRY BEDDED SHED AND ASSOCIATED SITE DEVELOPMENT WORKS INCLUDING EXTENSION OF ACCESS ROADWAY
ELEMENTS OF WIND FARM INFRASTRUCTURE AND RECTIFICATION OF ASSOCIATED RED LINE BOUNDARY
REVISIONS TO THE LAYOUT OF LENELEA WIND FARM (PLANNING REF:09/50116), 200M OF NEW SECTION OF TRACK AND MINOR ROAD IMPROVEMENTS WITHIN THE ADJACENT OPERATIONAL CARK (PLANNING REF: 02/8328), MEENTYCAT (01/8038) AND MEENALABAN (02/8008) WIND FARMS TO FACILITATE DELIVERY OF TURBINE COMPONENTS TO LENALEA. THE DEVELOPMENT WILL CONSIST OF THE FOLLOWING REVISIONS (1) OMMISSION OF PREVIOUSLY PERMITTED PERMANENT MET MAST AND ACCESS TRACK (2) OMMISSION OF PREVIOUSLY PERMITTED TURBINE T1 AND T4 AND ASSOCIATED TRACK (3) OMMISSION OF PREVIOUSLY PERMITTED TEMPORARY CONTRACTORS COMPOUND (4) OMMISSION OF PREVIOUSLY PERMITTED BORROW PIT (5) PROVISION OF PERMANENT MET MAST AND ACCESS TRACK AT A REVISED LOCATION (6) PROVISION OF A NEW MATERIAL STORAGE AREA (7) PROVISION OF TWO NEW EXCAVATED BORROW PITS (8) PROVISION OF A NEW TEMPORARY CONSTRUCTION COMPOUND (9) REVISED SUBSTATION LAYOUT TO MEET EIRGRID SPECIFICATION FOR 110 KV SUBSTATIONS (10) ADJUSTMENT TO ALIGNMENT OF PREVIOUSLY PERMITTED INTERNAL WIND FARM ROADS (11) ALL ASSOCIATED DRAINAGE AND CABLING (12) UPGRADING OF EXISTING ACCESS TRACK FROM OPERATIONAL CARK WIND FARM (PLANNING REF: 02/8328) TO THE PERMITTED SOUTHERN SITE ENTRANCE (13) LOCALISED WIDENING OF THE MAIN ACCESS ROAD THROUGH THE OPERATIONAL CARK (PLANNING REF: 02/8328), MEENTYCAT (01/8038) AND MEENALABAN (02/8008) WIND FARMS TO FACILITATE TURBINE COMPONENT DELIVERY TO LENALEA WIND FARM
CONSTRUCTION OF WIND FARM, CONSISTING OF 9 WIND TURBINES OF UP TO 85M HUB HEIGHT AND UP TO 100M BLADE DIAMETER WITH A TOTAL HEIGHT NOT EXCEEDING 135M, A PERMANENT METEROLOGICAL LATTICE MAST 85M HIGH, A SUBSTATION AND ASSOCIATED EQUIPMENT, A BORROW PIT, INTERNAL SITE TRACKS, DRAINAGE AND ASSOCIATED WORKS
REPOSITIONING OF A SECTION OF THE EXISTING 38KV LINE KNOWN AS THE CARK-CULLIAGH 38KV LINE CONSISTING OF INSTALLATION OF 8 NEW STRUCTURES. THE AFFECTED LINE SECTION IS 700M
The brief summarizes the pattern across all 32 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 1951995The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief