Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 188 decisions within 5 km, 1 exact-site or onsite candidate record, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
INSTALLATION OF AN UNDERGROUND WATER TANK WITH PIPEWORK TO A PROPOSED GENERATOR ROOM TO BE CONSTRUCTED ADJACENT TO EXISTING DWELLING HOUSE FOR A SMALL HYDRO POWERED GENERATOR FOR DOMESTIC USE AND ALL ASSOCIATED SITE WORKS
ERECTION OF DWELLING HOUSE, SEWERAGE TREATMENT SYSTEM & PERCOLATION AREA, DOMESTIC GARAGE AND ASSOCIATED SITE WORKS
ERECTION OF A NEW DWELLING HOUSE WITH SEPTIC TANK INCLUDING A DOMESTIC GARAGE AND ASSOCIATED SITE DEVELOPMENT WORKS UTILISING EXISTING FOUNDATIONS ALREADY APPROVED UNDER PLANNING REF NO. 03/755
CONSTRUCTION OF A NEW DWELLING HOUSE, PROPRIETARY WASTE WATER TREATMENT SYSTEM AND PERCOLATION AREA, DOMESTIC GARAGE & ASSOCIATED SITE WORKS
40 YEAR PERMISSION FOR AN ADDITIONAL 1 NO. WIND TURBINE, TO THE EXISTING 3 NO. TURBINE WINDFARM CONSISTING OF CONSTRUCTION OF: (1) 1 NO. WIND TURBINE WITH A HUB HEIGHT OF UP TO 84 METRES AND AN OVERALL HEIGHT OF UP TO 125 METRES TO BLADE TIP, (2) 1 NO.CRANE HARDSTAND AREA LOCATED BESIDE THE TURBINE, (3) 1 NO. 20 kV SUBSTATION BUILDING WITH ASSOCIATED ELECTRICAL PLANT AND EQUIPMENT, (4) INTERNAL WIND FARM UNDERGROUND CABLING, (5) NEW SITE ACCESS TRACK, (6) INSTALLATION OF A DRAINAGE SYSTEM FOR THE PROPOSED HARD STAND AND ACCESS TRACK AREAS, (7) UNDERGROUND GRID CONNECTION OF APPROXIMATELY 910 METRES IN LENGTH, PREDOMINANTLY ALONG THE EXISTING WIND FARM ACCESS ROAD NETWORK AND ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKS IN THE TOWNLANDS
CONSTRUCTION OF A NEW DWELLING HOUSE, DOMESTIC GARAGE, PROPRIETARY SEWERAGE TREATMENT SYSTEM AND PERCOLATION AREA AND ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 188 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2051589The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief