Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 858 decisions within 5 km, 2 exact-site or onsite candidate records, and 30 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedNo zoning and settlement layer is loaded for Donegal County Council; this brief draws on decision history instead and makes no mapped-constraint claim.
One current citation from the Donegal County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Donegal County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
30 structured nearby appeal records.
30 matchedCitations are current-dated and carry policy name, section, page and source URL from the Donegal County Council development plan.
1 matchedOpen preview
Open preview
(1) ENTRY PORCH CONSTRUCTED OVER THE EXISTING ACCESS RAMP (2) 2NO. EXTERNAL SIGNS (C) SERVICE HATCH ALL LOCATED ON THE SOUTH EAST FACING ELEVATION AND PERMISSION FOR (1) REMOVAL OF THE EXISTING CONCRETE RAMP ACCESSING THE BEACH (2) CONSTRUCTION OF A TIERED BALCONY AREA WITH 2.1M HIGH PERIMETER GLAZED WIND BREAKER, RETRACTABLE AWNINGS, ACCESS FROM THE EXISTING BUILDING AND STEPPED ACCESS FROM THE FOOTPATH (3) CONSTRUCTION OF NEW STEPPED AND RAMPED ACCESS TO THE BEACH
EXTENSION OF AN EXISTING APARTMENT BLOCK TO PROVIDE 4 NO. ADDITIONAL APARTMENTS WITH ASSOCIATED STAIRWELL AND ALL ASSOCIATED WORKS AND SITE WORKS
RETENTION AND COMPLETION OF ALTERATIONS TO EXISTING DWELLING COMPRISING; REVISED FRONT PORCH AND BAY WINDOW DESIGN, REAR SINGLE STOREY EXTENSION, ALTERATIONS TO EXTERNAL ELEVATIONS, REVISED SINGLE STOREY DETACHED SIDE GARAGE AND BOILER ROOM AND ALL ASSOCIATED SITE WORKS
CONSTRUCTION OF A NEW STOREY AND A HALF DETACHED DWELLING, NEW VEHICULAR ENTRANCE WITH A REALIGNED BOUNDARY WALL AND NEW PARKING AREA FOR THE DEVELOPMENT ACCESSED FROM AILEACH ROAD (AT LOCATION OF EXISTING VEHICULAR ENTRANCE), WHICH WILL BE LINKED TO THE DWELLING BY MEANS OF A NEW RIGHT OF WAY
A TEN YEAR DURATION FOR DEVELOPMENT CONSISTING OF THE CONSTRUCTION OF A NEW STORM WATER STORAGE TANK AND ASSOCIATED WORKS
(A) DEMOLITON OF A SINGLE STOREY LEAN-TO AT THE REAR OF DWELLING (B) CONSTRUCTION OF A TWO-STOREY EXTENSION TO THE REAR OF DWELLING AND ALL ASSOCIATED WORKS
The brief summarizes the pattern across all 858 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2150381The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief