Applications tied to the site
Partial coverage10 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
10 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 222 decisions within 5 km, 10 exact-site or onsite candidate records, and 7 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
10 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
10 matchedNo zoning and settlement layer is loaded for Donegal County Council; this brief draws on decision history instead and makes no mapped-constraint claim.
One current citation from the Donegal County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Donegal County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
7 structured nearby appeal records.
7 matchedCitations are current-dated and carry policy name, section, page and source URL from the Donegal County Council development plan.
1 matchedOpen preview
Open preview
(1) DEMOLITION OF EXISTING BUILDING AND (2) ERECTION OF NEW BUILDING WHICH WILL INCORPORATE (A) A CLASS 1 COMMERCIAL BUILDING, (B) SHOP, (C) POST OFFICE, (D) OFF-LICENCE, (E) STORE, (F) DELI, (G) TOILETS INCLUDING ACCESSIBLE TOILETS, (H) STAFF WELFARE FACILITIES, (I) FORECOURT, (J) REPLACEMENT OF UNDERGROUND STORAGE TANKS AND PUMPS, (K) EXTERNAL CANOPY, (L) ASSOCIATED SIGNAGE AND (M) ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS INCLUDING A SPACE FOR A MEMORIAL GARDEN
(1) EXISTING STORAGE CONTAINER (2) AMENDMENTS TO SHOP FLOOR LAYOUT (3) CHANGE OF USE OF TWO APARTMENTS TO COMMERCIAL USE AND PERMISSION FOR (A) CHANGE OF USE OF PORTION OF EXISTING SHOP TO AN OFF LICENCE (B) CHANGE OF USE OF EXISTING STORE TO A POST OFFICE (C) CONSTRUCTION OF A STORE ROOM AND ALL ASSOCIATED SITEWORKS
(1) DEMOLITION OF EXISTING DWELLING HOUSE, (2) ERECTION OF A NEW BUILDING WITH CONNECTION TO ALL PUBLIC SERVICES WHICH WILL INCORPORATE (A) SHOP, (B) POST OFFICE, (C) OFF-LICENCE, (D) STORE, (E) DELI, (F) TOILETS INCLUDING ACCESSIBLE TOILETS, (G) STAFF WELFARE FACILITIES, (H) FORECOURT, (I) UNDERGROUND STORAGE TANKS AND PUMPS, (J) EXTERNAL CANOPY, (K) CAR WASH FACILITY, (L) ASSOCIATED SIGNAGE INCLUDING TOTEM SIGNAGE, (M) AN OUTDOOR LAUNDRETTE KIOSK, (N) OUTDOOR FUEL BUNKER STORAGE AND (O) AN ATM AND (3) ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF A GLAMPING AREA AND PROVISION OF 12 NO. GLAMPING STUDIO PODS WITH CONNECTION TO MAIN SEWER AND ALL OTHER ASSOCIATED WORKS
EXISTING GLAMPING AREA AS CONSTRUCTED (PLANNING REF: 17/51784) AND PERMISSION FOR CONSTRUCTION OF 10 NO. ADDITIONAL GLAMPING PODS ASSOCIATED TO THE EXISTING CAMPING / GLAMPING AREA WITH CONNECTION TO MAIN SEWER AND ALL OTHER ASSOCIATED WORKS
CONSTRUCTION OF A NEW CARPARKING AREA WITH 6 NO. EV CHARGING POINTS INCLUDING ALL ASSOCIATED SITE WORKS, WITHIN COMMERCIAL TOURISM DEVELOPMENT
The brief summarizes the pattern across all 222 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2450106The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief