Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 481 decisions within 5 km, 5 exact-site or onsite candidate records, and 36 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
36 structured nearby appeal records.
36 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The proposed development consists of the construction of a 2 story domestic dwelling with new residential entrance, detached garage and shed, wastewater treatment system with polishing filter and all associated site works
For development consisting of (1) the erection of a new extension to the rear (north) elevation of our existing dwelling house, (2) new bay window to the (east) side elevation at ground floor, (3) remodelling of existing front porch, *(4) alteration to dwelling & garage fenestration, (5) remodel existing vehicular entrance & erect new piers & (6) upgrade existing effluent treatment system, together with all associated site development works
Permission for retention of bay window and porch constructed to the front of existing dwelling house and all associated works
Development consisting of the construction of new extensions to the side and rear of the existing dwelling, comprising of a 1.5 storey extension to the east of he existing dwelling (total floor area: 45 sq.m); A dormer to the rear roofspace of the existing dwelling (20 sq.m.); An addition of a new glazed space to the rear of the existing dwelling (5 sq. m.), and changes to the front elevation comprising of the removal of one chimney stack and the reconfiguration of windows and door openings, including all site clearance and development works
- Retention Permission for extensions to existing dwelling and material alterations as constructed,- Retention of 1 domestic garden steel storage shed as constructed with a gross area of 14.35m2 located to north-east of existing dwelling along with ancillary works. Previous Planning Register Number: PL6400/76.
PP - for development consisting of the construction of a two-storey dwelling house, domestic carport, proprietary effluent treatment system, and all associated site works, including the use of the existing site entrance.
The brief summarizes the pattern across all 481 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2460185The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief