Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
28% of nearby decided applications were refused. The site check found 214 decisions within 5 km, 1 exact-site or onsite candidate record, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For the construction of a new single storey dwellinghouse with treatment system and percolation area with all associated services. Gross floor space of proposed works: 90 sqm
Chun teach cónaithe, gáráiste agus córas séarachais a thógáil. Spás urláir comhlán na n-oibreacha beartaithe: 254 sqm
Ar fhoirgneamh uile-úsáideach atá ar an suíomh faoi láthair, maraon le comharthaíocht atá ann, athruithe airde agus suimh stórala ag taobh an fhoirgnimh atá ar theorainneacha suímhe athcheartaithe, agus iarrtar cead athrú a chur ar ardaithe agus ar leagan amach inmheánach atá ann agus iarrtar cead painéil ghréine maraon le gach seirbhís gaolmahr a chur ar fail. Spás urláir comhlán na hoibre atá le coinneáil: 13.66 msq
For the demolition of an existing building, and extension and alterations to an existing national school with associated services, upgrading of existing effluent treatment system and the installation of an all-weather pitch including lighting and fencing (Gross floor space proposed 201.4sqm; demolition 159sqm)
D'athrú úsaíde ar chuid d'aonad atá ann cheana féin ó úsaídThion scalaíoch Éadron go húsaíd Oideachais ( 180.22 sqm) & oibreacha suímhg gaolmhara ar fad ag Tír an Fhia, Leitri Móir, co. na Gaillimhe.
Le h-aghaidh theach cónaithe, garaiste, seirbhisi agus coras coireala Kinspan Environmental a thogail. Spás urláir comhlán na n-oibreacha beartithe i 234sqm (teach) agus 45 sqm (garaiste)
The brief summarizes the pattern across all 214 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2461403The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief