Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 214 decisions within 5 km, 3 exact-site or onsite candidate records, and 7 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
7 structured nearby appeal records.
7 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
ERECTION OF AN EXTENSION TO THE SIDE AND REAR OF EXISTING DWELLING HOUSE WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS
ERECTION OF AN EXTENSION TO THE SIDE OF EXISTING DWELLING HOUSE WITH ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
ERECTION OF 2 NO. APARTMENTS WITH CONNECTION TO PUBLIC SEWER AND ALL ASSOCIATED ANCILLARY SITE DEVELOPMENT WORKS
(1) DEMOLITION OF EXISTING DWELLING HOUSE, (2) ERECTION OF A NEW BUILDING WITH CONNECTION TO ALL PUBLIC SERVICES WHICH WILL INCORPORATE (A) SHOP, (B) POST OFFICE, (C) OFF-LICENCE, (D) STORE, (E) DELI, (F) TOILETS INCLUDING ACCESSIBLE TOILETS, (G) STAFF WELFARE FACILITIES, (H) FORECOURT, (I) UNDERGROUND STORAGE TANKS AND PUMPS, (J) EXTERNAL CANOPY, (K) CAR WASH FACILITY, (L) ASSOCIATED SIGNAGE INCLUDING TOTEM SIGNAGE, (M) AN OUTDOOR LAUNDRETTE KIOSK, (N) OUTDOOR FUEL BUNKER STORAGE AND (O) AN ATM AND (3) ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
(1) EXISTING STORAGE CONTAINER (2) AMENDMENTS TO SHOP FLOOR LAYOUT (3) CHANGE OF USE OF TWO APARTMENTS TO COMMERCIAL USE AND PERMISSION FOR (A) CHANGE OF USE OF PORTION OF EXISTING SHOP TO AN OFF LICENCE (B) CHANGE OF USE OF EXISTING STORE TO A POST OFFICE (C) CONSTRUCTION OF A STORE ROOM AND ALL ASSOCIATED SITEWORKS
(1) DEMOLITION OF EXISTING BUILDING AND (2) ERECTION OF NEW BUILDING WHICH WILL INCORPORATE (A) A CLASS 1 COMMERCIAL BUILDING, (B) SHOP, (C) POST OFFICE, (D) OFF-LICENCE, (E) STORE, (F) DELI, (G) TOILETS INCLUDING ACCESSIBLE TOILETS, (H) STAFF WELFARE FACILITIES, (I) FORECOURT, (J) REPLACEMENT OF UNDERGROUND STORAGE TANKS AND PUMPS, (K) EXTERNAL CANOPY, (L) ASSOCIATED SIGNAGE AND (M) ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS INCLUDING A SPACE FOR A MEMORIAL GARDEN
The brief summarizes the pattern across all 214 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2562275The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief