RETENTION: Retention Permission is sought for single storey extension to the side and associated site development to dwelling house at Saint John, 27 Elmdale Crescent, Dublin 10.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Saint John, 27, Elmdale Crescent, Dublin, 10
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
12% of nearby decided applications were refused. The preview found 4,867 nearby planning records within 5 km where a location match is available.
- Matched source
- 2030/20
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Permission involving the change of use of a community education building to residential use (1 four-bed dwelling unit) including removal of external shutters from doors/windows, removal of polycarbonate roof to the rear, interior alterations including addition of an ensuite, removal of a sink and double doors, and reconfiguration of an existing bathroom, change of use of the rear studio building to office/gym use and all associated site works.
RETENTION: Permission for a detached single storey gym/office/storage shed to rear of existing house with ancillary works.
Permission for the construction of a two- storey classroom building for additional crèche facilities and all associated site development works to the east elevation at the south corner of St. Ultan's Campus.
PERMISSION:For the construction of an ASD School Playground area and all associated site development works to the west elevation at south corner of the St. Ultan's Campus, Cherry Orchard Ave, Cherry Orchard, Dublin 10.
The development will consist of a new 208sqm single-storey extension to the south of the existing childcare facility containing additional classrooms and associated service spaces. The building is to be clad in timber with a standing seam metal roof to match existing and to include a glazed canopy over connecting walkway to the existing building. External works are to include an expansion of the existing playground area to the west of the building and additional covered bike parking and car parking spaces to the east with relocated car park exit. The whole site is to be surrounded with a continuation of the existing perimeter fence. All with associated services including roof mounted photovoltaic array.
The full report covers all 4,867 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record 2030/20The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report