The development will consist of the installation of a roof mounted solar photovoltaic panels and all ancillary works and services.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Cedar House, Park West Business Park, Joyce Way, Cherry Orchard, Dublin 12
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
12% of nearby decided applications were refused. The preview found 4,752 nearby planning records within 5 km where a location match is available.
- Matched source
- 2221/19
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
The development will consist of the change of use of the ground, first and second floors from class 3 office use to class 8 for use as a health centre / clinic along with all associated works.
Change of use of warehouse to jump/activity sports centre to include jump/activity areas, reception, ancillary café, seating area, bathrooms, storage rooms, office/party rooms, staff rooms and two additional fire escape doors and all associated site works.
The development will consist of: The erection of two No. illuminated signs on the west and south facade of the existing building known as block 20 and all assocated site works.
The development comprises the retention of the following amendments to the development permitted under Reg. Ref.: SD20A/0309, as amended by Reg. Ref.: SD22A/0093 and Reg. Ref.: SD23A/0158, which arose during the detailed design / construction stage of the project: Amendments at plant and roof level including the reconfiguration of plant and associated extracts, provision of a roof level package plantroom, provision of 2 no. backup landlord generators, reconfigured gantry associated with the 2 no. back-up landlord generators, and reconfiguration of solar PV panels; The provision of 2 no. pumproom buildings to accommodate process water and fire water with a gross floor area (GFA) of c. 44 sq.m and c. 105 sq.m; The provision of underground water process tanks located to the south of ICT Facility 1; The provision of a wastewater treatment skid located to the west of ICT Facility 1; Reconfiguration of car parking spaces resulting in an overall reduction of 1 no. car parking spaces from 44 no. car parking spaces to 43 no. car parking spaces; Relocation of permitted cycle parking from the north of ICT Facility 1 to the south of ICT Facility 1; Amendments to fenestration and arrangement of façade treatment to ICT Facility 1 and minor reconfiguration of the internal layout; and All associated and ancillary works. An EPA-Industrial Emissions Directive (IE) licence is required to facilitate the operation of the development.
This development will consist of the following works to the existing generator compound located at the north of the site: (1) the change of use from a generator compound to an enclosed bicycle store, (2) replacing the existing metal grate roof with a new single skin non-drip flat roof; to cover 24 secure bicycle store spaces and 3 electric scooter spaces.
The full report covers all 4,752 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record 2221/19The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report