The development will consist of the change of use of an existing external store, which is to be converted to a boiler room, installation of a boiler and flue and replacement of an existing steel door with a new steel louvered door.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Scoil Chiarain CBS, Collins Avenue East, Donnycarney, Dublin 5
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
10% of nearby decided applications were refused. The preview found 9,015 nearby planning records within 5 km where a location match is available.
- Matched source
- 2668/21
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
The development will consist of: alterations to previously approved permission (3381/16) (1) Reduce kitchen extension by 1.2m, remove canopy. (2) Replace hip roof to extension with flat roof. (3) New attic dormer window to rear pitched roof and finished to match. All services connected to existing.
RETENTION permission for a new vehicular entrance 3.2m wide to facilitate off street parking.
The development consists of a new two storey extension with flat roofs to the rear of the existing terraced house and all associated site works.
The development will consist of a proposed new detached ground floor only building to the rear of the existing site to be used as a gym/games room and all ancillary works.
The development will consist of a proposed new ground floor only extension to the rear of the existing house and all ancillary works.
The full report covers all 9,015 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record 2668/21The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report