PlanIntelPlanning precedent preview

Planning precedent report

Within the existing Diageo brewery production facility at St. James's Gate, toward the northern boundary of the site facing Victoria Quay and the River Liffey, Dublin 8

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

13% of nearby decided applications were refused. The preview found 12,112 nearby planning records within 5 km where a location match is available.

Matched source
3103/19
Project type
One-off house
Coverage
5 km radius
12,112Nearby applications
13%Refused
10,535Conditional grants
0Refusal reasons

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest similar decisions

3103/19

Diageo Ireland intend to apply for planning permission (temporary for 5 years) for development withing the existing Diageo brewery production facility at St. James's Gate, toward the northern boundary of the site facing Victoria Quay and the River Liffey, Dublin 8. The development will comprise a temporary storage warehouse (marquee) (675sq.m) and all associated works; all on a site of c.0.0909ha. The proposed development is located within a site which has an approved IE (Industrial Emissions) Licence (Ref No. P0301-04).

Granted0.0 km19 July 2019
4104/21

The proposed development will consist of a new extension to the existing beer processing plant to include a two storey building and six processing tanks. The proposed two storey extension has a total GFA of c. 1,024 sq.m and a building height to parapet level pof c. 14.4 m (20.9m OD). The building will be accessed via ground level doors and serviced through roller shutter doors on the southern elevation. The extension will be designed using new composite brown metal cladding similar to existing building materials within the brewery. The extension has a flat roof with a small plant area (c. 24 sq.m) screened by metal cladding panels and supportive steel frames. Six processing tanks c.24.52m (30.47m OD) are proposed to the north of the proposed extension. These tanks will be smaller than but visually match the existing tanks on site to the east. There will also be associated drainage connections to be made. The proposed development is located centrally within the brewery and is in accordance with the continued use of the site as a brewery. The proposal is located within a site which has an approved IE (Industrial Emissions) Licence (Ref No. P0301-04).

Granted0.1 km18 February 2022
4416/22

The description of development is as follows: Removal of existing fence through the site and development of a Nitrogen Generation Plant to produce nitrogen enriched gas for use in the production of beer at a site located centrally within the brewery site. The development will include a lattice style cold box Instillation tower to a height of c. 26m, 2 no. cylindrical storage tanks to a height of c.21m and plant and machinery for the production of nitrogen including a cold box vaporiser installation, a warm end installation, a Lin pump cold box installation, an expander module, cold valves, ambient vaporisers, final control skid and all other associated works. A new fence around the proposed plant is also proposed. The proposal is located within a site which has an approved IE (Industrial Emissions) Licence (Ref No. P0301-04).

Granted0.1 km31 August 2022
WEB2472/24

PROTECTED STRUCTURE: The proposed development comprises a 10 year permission for works to facilitate the decarbonisation of the brewery and water recovery on site. Demolition and removal of the Old Keg Plant Building and Export Warehouse (part single storey, part two storey buildings – 6,482m2) and associated works including removal of a section of a steel pipe bridge structure. Construction of an Energy Centre comprising a two storey building containing electrical boiler room LV, MCC and HV Rooms with a primary parapet height of 15.15m and including 3 no. flues to a height of 23.65m (28.1m O.D) and external plant compound (72m2) containing transformer equipment. The overall GFA of the Energy Centre (2) Building is c. 788m2. A blue roof (for rainwater attenuation) is proposed at roof level. Construction of a two-storey Water Recovery Plant (WRP) Building with a primary parapet height of 17.35m containing WRP plant and ancillary staff facilities. The overall GFA of the WRP Building is 1,576m2. A blue roof is proposed at roof level. The Water Recovery Plant also includes the following external plant elements: External Equalisation Tank with height of 13.25m including external access stairway; 2 no. Biogas Scrubbers with a height of 6.3m above parapet level and 1 no. emergency flare at a height of 7.5m above parapet level. 2 no. anaerobic treatment tanks to a height of c. 21m above ground level and external odour control plant. Aerobic treatment aeration tank to a height of 12.04m (+17.33 O.D.) with external access stairway, external renewable Biogas Balloon, other external items including ancillary plant / equipment, enclosing bund walls and circulation infrastructure. Demolition and removal of the former Flaking Plant (c. 46m / 11 storey equivalent in height) located centrally within the site (3,001m2), 1 no. two-storey prefabricated building, 1 no. single storey electrical distribution room, 6 no. single storey cabins / containers, vehicular concrete ramp and section of steel pipe bridge structure (691m2). Construction of a Utilities Hub comprising a proposed split-level building comprising a single storey structure (at lower ground level) ranging in height from 4.2m to 9.2m containing heat pumps, workshop, staff accommodation and ancillary plant, and a single-storey structure (at upper ground level) for use as Energy Centre (1) containing electrical boiler room to a height to parapet level of 8.72m, 2 no. flues to a height of 17.22m above upper ground level and including external plant compounds containing transformer equipment at the upper ground level (258m2), and 3 no. external vessels 15m in height at lower ground level. A blue roof is proposed at roof level. External stairs, ancillary site works, hard and soft landscaping are proposed. The Utilities Hub will comprise a GFA of c. 1,996.2m2. The proposed development includes associated site development works including hard and soft landscaping and the extension of new site services routes (both underground and above ground) including ancillary pipe racks, providing electrical and utilities infrastructure, above and below ground drainage. An additional 26 no. bicycle parking spaces are proposed. The application site is located in the curtilage of a number of Protected Structures. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) will be submitted to the Planning Authority with the planning application and the EIAR and NIS will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority. The proposal is located within a site which has an approved IE (Industrial Emissions) Licence (Ref: P0301-04).

Granted0.1 km14 January 2025
3408/19

Planning permission for development within the existing Diageo brewery production facility at St. James's Gate, at a site centrally located within the St. James's Gate brewery lands bound by James Street to the south, Watling Street to the east and Victoria Quay to the north, Dublin 8. Works to existing industrial building accommodating kegging activities at the brewery comprising: 1) demolition of north-eastern corner of building and annexes, reconfiguration to accommodate 4 no. vehicular loading bays, 1 no. pedestrian door and associated elevation treatment; 2) alterations to northern facade as follows: removal of free-standing staff annexes, recladding, new and reconfigured roller shutter openings (8 no. in total) and pedestrian doors (3 no. in total); 3) new screened plant and safety railings at roof level; and 4) all other associated works. The works also include demolition of existing free-standing double height Fork Lift Truck (FLT) building and associated smaller shed. The proposed development is located within a site which has an approved IE (Industrial Emissions) Licence (Ref. No. P0301-04).

Granted0.1 km27 August 2019
4358/19

We, Diageo Ireland, intend to apply for planning permission for development within the existing Diageo brewery production facility at St. James's Gate, at a site centrally located within the St. James's Gate brewery lands bound by St James Street to the south, Watling Street to the east, Victoria Quay to the north and Steven's Lane to the west, Dublin 8. The development will consist of works to an existing industrial building accommodating kegging activities at the brewery comprising: a) Demolition of a single-storey cabin and panel cladding in the south-east corner of the site. b) Relocation of internal storage and welfare rooms at ground floor and internal office floorspace at first floor to a new location within the building on the southern elevation comprising office, workshops, storage, utilities, locker and changing facilities, lobbies and circulation space over ground and first floor. c) A new centrally located control and server room. d) Renovation and re-cladding of parts of the eastern, southern and western elevations comprising: (i) alterations to the eastern elevation including: re-cladding; the infilling of windows and a door; and the provision of a new external access ladder. (ii) alterations to the southern elevation including: external covered stairs to first floor level; re-cladding; new entrance doors including two louvred shutter doors and a smaller louvred goods door; two new windows; ventilation louvres; a canopy above the main pedestrian entrance door; ramped pedestrian access to the south of the building to provide level access as well as a small storage building with canopy above; and gantry style piperack to extend from the southern elevation to connect with the existing piperack. (iii) alterations to the western elevation including: re-cladding; and the provision of an external access ladder. e) A new parapet and railing at roof level on the southern elevation and part of the eastern and western elevations. f) All other associated works. The proposed development is located within a site which has an approved IE (Industrial Emissions) Licence (Ref No. P0301-04).

Granted0.1 km19 December 2019

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required