Planning permission for the relocation of the existing single storey security hut with associated bollards and barriers on the east side of the Tolka River crossing on the main access road from Alfie Bryne Road and to the north of Black 1; the erection of four new single storey steel framed and glazed bus shelters at four locations throughout the park and on the main circulation roadway - No 1 between Block L & N and oppossite Block B2; No 2 to the north of Block U; No 3 to the west of Block P3 and oppoite Block R; No 4 to the north of Block P4; along with associaties site works.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
East Point Business Park , Alfie Byrne Road, Fairview, Dublin 3
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
12% of nearby decided applications were refused. The preview found 11,527 nearby planning records within 5 km where a location match is available.
- Matched source
- 3157/20
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
The development will consist of c.235kWp (c.11.60m2) of roof mounted solar PV panels and all associated works.
CHANGE OF USE: The proposed development will consist of the change of use of the Block U building from office use to medical use (total 1591.5 sq.m GFA) and is described on a level-by-level basis as follows: Ground Floor: 7no. Consulting rooms, 2no. Offices, Entrance Lobby (incl. Waiting area and Reception), Record room, Staff room with Kitchenette, Storeroom, Comm/IT room, 2no. Utility rooms and all ancillary accommodation. First Floor: 3no. Labs, 2no. Offices, 2no. Utility rooms, Waiting area, Teaching/Training room, Support room, 2 no. Stores, Staff Room, and all ancillary accommodation. Second Floor: 3no. Labs, 2no. Offices, 2no. Utility rooms, Waiting area, Teaching/Training room, Support room, Kitchenette, AHU Room, and all ancillary accommodation. The proposed development involves modifications to the internal layout of the Block U building consisting of 3 floors to facilitate this change of use from office space to medical use. To facilitate the proposed change of use at second floor level, a reduction in the size of the skylight on roof of the Block U building is proposed. No alterations are proposed to the external façades of the Block U building. In total 25no. car parking spaces (including 2no. accessible spaces) are proposed to serve the proposed development. The proposed development involves the reconfiguration of existing car parking arrangements for the Block U building to facilitate an increase from 1no. to 2no. accessible spaces and an overall reduction from 28no. to 25no. car parking spaces in total. The proposed development will be served by 2no. existing covered bicycle parking stores together providing a total of 30no. bicycle parking spaces. Planning permission is also sought for the relocation of existing bins to a new bin store and collection area to the rear of the Block U building in the southwest corner of the subject site as well as all ancillary site services and site development works.
The proposed development will consist of the change of use Building P8 from office use to medical use (GFA: 3534 sq.m) and is described on a level-by-level basis as follows: Ground Floor: 3no. Physiotherapy rooms, Office Reception, 3no. Offices, Entrance Lobby (incl. Waiting area and Reception), Staff Room, Storage room, First Aid room, 2no.Staff Showers, Kitchenette, and all ancillary accommodation; First Floor: 7no. Consulting rooms, Treatment room, 2no. Utility rooms, Interview room, 4 no. Stores, 2no. Offices, Staff Kitchen/Lounge, Reception/ Admin room, Breakout space, and all ancillary accommodation; Second Floor: 8no. Consulting rooms, Treatment room, Reception, 4no. Offices, Interview room, 2no. Utility rooms,3no. Stores, Comms/IT room, Hot desking, and all ancillary accommodation; Third Floor: 8no. Consulting rooms, Treatment room, Reception, 5 no. Offices, 2no. Utility rooms, 3no. Stores, Comms/IT room, Staff Kitchen Lounge, and all ancillary accommodation; Fourth Floor: 3no. Research Labs, 6no. Offices, IT Hub, Waiting area, Teaching space/Meeting room, 2no. Utility rooms, Staff Kitchen Lounge, and all ancillary accommodation; Fifth Floor: 3no. Research Labs, 2no. Utility rooms, 4no. Offices, Reception, Store, Waiting area, and all ancillary accommodation; The proposal involves modifications to the internal layout of the Building P8 building consisting of 6 floors, to facilitate this change of use from office space to medical use. Minor alterations to the external façade of the southern elevation of the building are proposed to facilitate the change of use. The proposed development involves the reconfiguration of the existing parking arrangements to facilitate an increase in the number of spaces available from 30no. to 34no. spaces (includes the provision of 2no. accessible parking spaces) and increase in bicycle parking spaces from 48no. to 60no. spaces. Planning permission is also sought for the creation of a pedestrian linkage on the western side of the building for accessibility to the car parking area, installation of new Perspex cover over the existing Bike racks and all ancillary site services and site development works.
The development will consist of the continued use of a temporary surface car park to provide ancillary parking for ESB staff temporally located at the gateway building, East Wall Road, during the redevelopment of the ESB Networks headquarters offices for a period up to a maximum of five years. The works include minor alterations to the existing internal car park layout reducing overall car parking capacity from 250 to 150 spaces. Permission is also sought to retain all entrances, security gates, security hut, lighting, boundary treatments and all ancillary site works without modification.
The development will consist of the continuance of use of a 100m long 6.5m wide single lane bridge with access ramps over the M50 and a storage area for imported cars and vans and all associated site development and service works as permitted under planning reg. ref. 2495/17 and reg. ref. 3788/11.
The full report covers all 11,527 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record 3157/20The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.