Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Phoenix House, Conyngham Road, St. James, Dublin 8

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

13% of nearby decided applications were refused. The preview found 11,465 nearby planning records within 5 km where a location match is available.

Matched source
3179/25
Project type
One-off house
Coverage
5 km radius
11,465Nearby applications
13%Refused
9,953Conditional grants
0Refusal reasons

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest similar decisions

3179/25

Demolition of the existing disabled access ramp, planter and adjacent steps, removal of 2 no existing car parking spaces, partial demolition of the main stepped entrance and construction of a replacement Part M compliant access ramp, planter, adjacent steps and disabled parking bay and all associated external works, services, drainage and landscaping works required to be undertaken in conjuction with this application.

Granted0.0 km23 June 2025
4281/24

The development will consist of a change of use of petrol filling station to provide bus parking and all associated site works including new boundary treatment to the Northern side of the site adjacent to Conyngham Road. This proposal also seeks to remove the hoarding to the boundary facing Conyngham Road. The site at present is derelict and has not been used as a petrol filling station since 2019. Vehicular access and egress will be by existing dished kerb entrance to the eastern side of the site. A new pedestrian entrance from Conyngham Road will also be created.

Granted0.2 km07 November 2024
2528/20

PROTECTED STRUCTURES: The proposed development comprises a change of use of: 1no. existing vacant, commercial/retail units (c.120.7 sq.m) to 2no. residential units with associated localised reconfiguration of internal floor plan, external elevation and curtilage, at ground level of Block F. Resulting in 2 no. new 1-bed residential apartment units. Associated site development and landscaping works, including private terraces, reallocation of 2no. car parking spaces in the existing basement car park, internal modifications and changes to façade opes and glazing to facilitate the change to residential units.

Refused0.3 km01 July 2020
4610/22

The proposed development will provide a mixed use commercial development comprising of a hotel (238 no. bedrooms) and an office block delivering a cumulative Gross Floor Area (GFA) of 32,602 sq.m, inclusive of basement area. The proposed development consists of: -Site clearance and localised demolitions to remove part of the podium and Basement Level-1 reinforced concrete slabs at the interface of the proposed hotel and office blocks, together with the incorporation of part of the existing basement level structure extending to approximately 4,228 sq.m (GFA). -The proposed basement will be integrated within the existing basement levels serving the wider HSQ development and will be accessed from the existing vehicular ramped accesses/egresses onto/off St. John's Road West and Military Road to the north and east, respectively. The proposed basement area is split into two areas to provide a dedicated Hotel Basement area of approximately 2,132 sq.m (GFA) and an Office basement area of 2,096 sq.m (GFA) -The construction of a 5-storey hotel (over lower ground and basement levels) to provide 238 no. bedrooms. At basement level provision is made for 24 no. car parking spaces; 2 no. motorcycle spaces together with plant and storage rooms. A waste storage area with dedicated loading bay/ staging area is provided along with dedicated set-down area for deliveries. A dual-purpose service bay is also provided at basement level with modifications to existing line markings to the basement parking area to accommodate the development. At Lower Ground floor level provision is made for 14 no. Bedrooms; Conference Room; Kitchen and Staff facilities and Changing Rooms/ WCs plus ancillary Gym. This floor is arranged around an internal courtyard space. Provision is made at Podium level for 19 no. Bedrooms; Dining Area and Foyer with entrance at the South-Eastern corner of the building onto a new laneway separating the proposed hotel and office building. Provision is made at the south-western corner at podium level for an ESB sub-station/switch room and 15 no Sheffield type bicycle stands are provided for the hotel and the retail/cafe unit, providing storage space for 30 no. bicycles. A total of 205 no. bedrooms are provided at the upper levels (above podium level). The top floor of the hotel (4th floor) has a splayed setback to provide a west facing roof terrace. An ancillary hotel bar (118 sq.m) opens onto this roof terrace. -The construction of a 12-storey (over lower ground and basement levels) office building to the east of the proposed hotel building to provide 19,474 sq.m of office floorspace (GFA) from lower ground floor level and above. Provision is made at basement level for 30 no. car parking spaces; 2 motorcycle spaces and 120 no. bicycle storage spaces together with plant and storage rooms. Provision is made for a further 196 no. bicycle storage spaces at Lower Ground floor level plus changing rooms (including showers). At podium level 2 no. ESB sub-stations and switch rooms are proposed. The foyer and entrance is provided at the southern end of the building at Podium level along with a Retail/Cafe unit of 208 sq.m at the South-Western corner of the building. The building is setback at 4th floor level to provide a west facing roof terrace. Splayed setbacks to the southern and eastern elevations at the 11th floor level forms a roof terrace that wraps around the South-Eastern corner of the building. Plant is provided at rooftop level that is enclosed by curved louvred screens and PV panels. -Works proposed along the St John's Road West frontage include the omission of the existing left-turn filter lane to the vehicular ramped access to the HSQ development and re-configuration of the pedestrian crossing at the existing junction together with the re-configuartion of the existing pedestrian crossing over the westbound lanes of St. John's Road West leading to an existing pedestrian refuge island and re-alignment of the existing foothpath along the site frontage onto St. John's Road West to tie into the reconfigured junction arrangement. -Drainage works proposed include the provision of 2 no. below basement surface water attenuation tanks with dusty/stand-by arrangement pump sumps and associated valve chambers, and 2 no. below basement foul pump sumps with duty/stand-by arrangement and 24hr emergency storage and associated valve chambers. New foul drainage and stormwater drainage connections are proposed to existing foul and storm sewers in St. John's Road West with associated site works. -Hard and soft landscaping works are proposed at lower ground level along St John's Road West and at podium level to provide for the extension and completion of the public plaza to the south of the proposed Office Block and the provision of a new pedestrian laneway connecting St John's Road West with the public plaza at podium level. The application is accompanied by an Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS).

Refused0.4 km28 September 2022
2837/20

The development will consist of the erection 2 no. perforated PVC face film signs on parts of the ground floor windows of the building - a 7.4 m x 3 m sign on the northern (St John's Road West) elevation and a 4.4m x 1.3 m sign on the southern elevation.

Granted0.4 km31 July 2020
4549/19

The development will consist of the erection of signage on the western elevation of the existing building, comprising one perforated vinyl sign at high level to the existing fully glazed lift core, measuring 11.24m high by 7.25m wide.

Refused0.4 km30 January 2020

The full report covers all 11,465 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required