Applications tied to the site
Partial coverage11 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
11 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 13,291 decisions within 5 km, 11 exact-site or onsite candidate records, and 3193 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
11 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
11 matched1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3193 structured nearby appeal records.
3,193 matchedCitations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.
1 matchedOpen preview
Open preview
The development will consist of the demolition of the existing 5-storey office/residential building on site (the total area for demolition is 2,910 sq.m.) and the construction of a new residential scheme on 11 floors at a height of 42.1m above ground level over an existing and extended basement. The residential development will comprise 20 no. 3-bed units all with winter gardens, communal roof garden and winter garden, terraces at fifth and seventh floors, residential amenity space at ground floor including meeting room, concierge and gym. 20 no. car parking spaces including 2 no. wheelchair accessible spaces at basement level, as well as 1 no. motorcycle space and 22 no. bicycle spaces and bin store. A further 6 no. bicycle spaces will be provided at ground floor level. The development will be served via the existing vehicular access point from Eglinton Road which will be widened, along with a new pedestrian entrance from Eglinton Road. The associated site and infrastructural works include provision for water services, foul and surface water drainage and connections, all landscape works, boundary treatment and electrical services including an ESB minipillar and all associated works above and below ground. The site is located within a Conservation Area.
The development will consist of the demolition of the existing 5-storey office/residential building on site (the total area for demolition is 2,910 sqm) and the construction of a new residential scheme of 62 units on 11 floors over an existing and extended basement. The residential development will comprise 7 no. studio apartments, 22 no. 1-beds, 31 no. 2-beds and 2 no. 3-bed units all with balconies/terraces; resident amenity spaces including a meeting room, concierge and a gym will be provided at ground floor level. A total of 20 no. car parking spaces will be provided at basement level, including 1 no. wheelchair accessible space. A bin store, 2 no. motorcycle spaces and 72 no. bicycle spaces will also be provided at basement level with a further 22 no. bicycle spaces at ground floor level. The development shall be served via the existing vehicular access point from Eglinton Road, which is to be widened, along with a new pedestrian entrance from Eglinton Road/Donnybrook Road. The uppermost roof will have PV panels and 3 no. roof lights. The associated site and infrastructural works include provision for water services; foul and surface water drainage and connections; all landscaping works; boundary treatments and electrical services; including an ESB substation.
The replacement of the existing 3-bay, 4.595m long x 1.42m wide x 2.295m high bus shelter including 2 no. static 6 sheet illuminated advertising displays with a 3-bay, 5.2m long x 1.848m wide x 2.8m high stainless steel and glass Reliance bus shelter with 1 no. 86 inch single sided digital advertising display and 1 no. static illuminated advertising display with works to widen pavement, removal of car parking space and including all associated site works and services.
The upgrade of an existing 6.33m x 3.57m trivision advertising display to a 6m x 2.88m digital advertising display on the northeastern elevation of Donnybrook Bus Depot, at the corner of Stillorgan Road and Beaver Row, Donnybrook, Dublin 4. In the event of planning permission being granted, 1 no. existing 6.33m x 3.57m trivision advertising display, which is adjacent to the proposed upgrade display, will be decommissioned.
Amendments to Planning Permissions Ref. WEB1683/24 and WEB1384/25, including a new ground-level side staircase for access to the first-floor balcony; a high-level window to the front at ground floor; a Velux window over the utility; a side window at first floor level; and new railings enclosing the balcony.
Amendment to Planning Permission Ref: WEB1683/24 - Installation of a New Inward-Opening Pedestrian Side Gate on Brookvale Road.
The brief summarizes the pattern across all 13,291 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 3386/22The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief