Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

St. James's Gate, at a site centrally located within the St. James's Gate brewery lands bound by James Street to the south, Watling Street to the east and Victoria Quay to the north, Dublin 8

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

13% of nearby decided applications were refused. The preview found 12,029 nearby planning records within 5 km where a location match is available.

Matched source
3408/19
Project type
One-off house
Coverage
5 km radius
12,029Nearby applications
13%Refused
10,464Conditional grants
2Refusal reasons

Top refusal reasons nearby

Design1
Visual Amenity1

Nearest similar decisions

3408/19

Planning permission for development within the existing Diageo brewery production facility at St. James's Gate, at a site centrally located within the St. James's Gate brewery lands bound by James Street to the south, Watling Street to the east and Victoria Quay to the north, Dublin 8. Works to existing industrial building accommodating kegging activities at the brewery comprising: 1) demolition of north-eastern corner of building and annexes, reconfiguration to accommodate 4 no. vehicular loading bays, 1 no. pedestrian door and associated elevation treatment; 2) alterations to northern facade as follows: removal of free-standing staff annexes, recladding, new and reconfigured roller shutter openings (8 no. in total) and pedestrian doors (3 no. in total); 3) new screened plant and safety railings at roof level; and 4) all other associated works. The works also include demolition of existing free-standing double height Fork Lift Truck (FLT) building and associated smaller shed. The proposed development is located within a site which has an approved IE (Industrial Emissions) Licence (Ref. No. P0301-04).

Granted0.0 km27 August 2019
4762/19

Planning Permission for development at the boundary wall of Diageo Brewery, Steeven's Lane, Dublin 8. The proposed development will consist of: (1) General repair and refurbishment works to the western boundary wall; (2) The demolition of a disused substation building adjoining the boundary wall; (3) The removal of 2 no. existing doors to the substation that is to be demolished (opes to be blocked up with matching rubble stone); (4) The removal of 2 no. timber window frames and sashes (opes to be blocked up with reclaimed brick); and (5) All associated works. The proposed development is located within a site which has an approved IE (Industrial Emission) Licence (Ref. No. P0301-04).

Granted0.1 km20 February 2020
4358/19

We, Diageo Ireland, intend to apply for planning permission for development within the existing Diageo brewery production facility at St. James's Gate, at a site centrally located within the St. James's Gate brewery lands bound by St James Street to the south, Watling Street to the east, Victoria Quay to the north and Steven's Lane to the west, Dublin 8. The development will consist of works to an existing industrial building accommodating kegging activities at the brewery comprising: a) Demolition of a single-storey cabin and panel cladding in the south-east corner of the site. b) Relocation of internal storage and welfare rooms at ground floor and internal office floorspace at first floor to a new location within the building on the southern elevation comprising office, workshops, storage, utilities, locker and changing facilities, lobbies and circulation space over ground and first floor. c) A new centrally located control and server room. d) Renovation and re-cladding of parts of the eastern, southern and western elevations comprising: (i) alterations to the eastern elevation including: re-cladding; the infilling of windows and a door; and the provision of a new external access ladder. (ii) alterations to the southern elevation including: external covered stairs to first floor level; re-cladding; new entrance doors including two louvred shutter doors and a smaller louvred goods door; two new windows; ventilation louvres; a canopy above the main pedestrian entrance door; ramped pedestrian access to the south of the building to provide level access as well as a small storage building with canopy above; and gantry style piperack to extend from the southern elevation to connect with the existing piperack. (iii) alterations to the western elevation including: re-cladding; and the provision of an external access ladder. e) A new parapet and railing at roof level on the southern elevation and part of the eastern and western elevations. f) All other associated works. The proposed development is located within a site which has an approved IE (Industrial Emissions) Licence (Ref No. P0301-04).

Granted0.1 km19 December 2019
4416/22

The description of development is as follows: Removal of existing fence through the site and development of a Nitrogen Generation Plant to produce nitrogen enriched gas for use in the production of beer at a site located centrally within the brewery site. The development will include a lattice style cold box Instillation tower to a height of c. 26m, 2 no. cylindrical storage tanks to a height of c.21m and plant and machinery for the production of nitrogen including a cold box vaporiser installation, a warm end installation, a Lin pump cold box installation, an expander module, cold valves, ambient vaporisers, final control skid and all other associated works. A new fence around the proposed plant is also proposed. The proposal is located within a site which has an approved IE (Industrial Emissions) Licence (Ref No. P0301-04).

Granted0.1 km31 August 2022
3103/19

Diageo Ireland intend to apply for planning permission (temporary for 5 years) for development withing the existing Diageo brewery production facility at St. James's Gate, toward the northern boundary of the site facing Victoria Quay and the River Liffey, Dublin 8. The development will comprise a temporary storage warehouse (marquee) (675sq.m) and all associated works; all on a site of c.0.0909ha. The proposed development is located within a site which has an approved IE (Industrial Emissions) Licence (Ref No. P0301-04).

Granted0.1 km19 July 2019
4104/21

The proposed development will consist of a new extension to the existing beer processing plant to include a two storey building and six processing tanks. The proposed two storey extension has a total GFA of c. 1,024 sq.m and a building height to parapet level pof c. 14.4 m (20.9m OD). The building will be accessed via ground level doors and serviced through roller shutter doors on the southern elevation. The extension will be designed using new composite brown metal cladding similar to existing building materials within the brewery. The extension has a flat roof with a small plant area (c. 24 sq.m) screened by metal cladding panels and supportive steel frames. Six processing tanks c.24.52m (30.47m OD) are proposed to the north of the proposed extension. These tanks will be smaller than but visually match the existing tanks on site to the east. There will also be associated drainage connections to be made. The proposed development is located centrally within the brewery and is in accordance with the continued use of the site as a brewery. The proposal is located within a site which has an approved IE (Industrial Emissions) Licence (Ref No. P0301-04).

Granted0.1 km18 February 2022

The full report covers all 12,029 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required