Planning permission to erect 1,718.00 m2 or 348.44 kW of photovoltaic panels on the roof of the building in our company with all associated site works.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Unit 3, IDA Industrial Estate, Poppintree, Dublin 11
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
9% of nearby decided applications were refused. The preview found 4,329 nearby planning records within 5 km where a location match is available.
- Matched source
- 3686/21
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
RETENTION PERMISSION for erecting 593.20m2 or 123.300 kWp of photovoltaic panels on the roof of our factory with all associated site works.
Planning Permission for the following: (i) Upgrade to existing Effluent Treatment system to include a new Balance Tank, Screen, DAF and Sludge Tank all located within a new detached Effluent and Control Building to the South of the existing Factory, (ii) Single storey extension to the northern elevation of the existing Factory consisting of a Refrigeration Plant Room and Electrical Room and (iii) all associated site works
RETENTION: Retention permission for a single storey extension to the rear, porch extension to the front and dormer window to the rear.
The development will consist of: Construction of new two bed detached bungalow total 83sqm, with pitched roof and 4sqm solar panels. All to rear of existing bungalow (No.2), and to be known as 2A Poppintree Cottages with off street parking. Vehicle access is via existing side entrance. All of the above to include new water connection and landscaping with all other services connected to existing.
The proposed development will consist of the construction of a hardstand area for the delivery and temporary storage of freight containers and parking of Heavy Goods Vehicles (Total GFA of hardstand works c.32.226m² ), the use of a former car parking area to provide 20 no. staff car parking spaces and the installation of temporary portacabin buildings comprising 1no. security /office hut (c.28m²), 1no. canteen (c.28m²), 1no. toilet block (c.10 m²) and 1no. shower block (c.10 m²) and 2 no. two security gate buildings (26 m²). The development will be accessed via two existing entrances from the Jamestown Road. The northern access is proposed to be entry only while the southern access is proposed to have an entry and exit arrangement.
Source match
Matched from public planning record 3686/21The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report