Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

St. James's Hospital, James's Street, Dublin 8

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

13% of nearby decided applications were refused. The preview found 12,457 nearby planning records within 5 km where a location match is available.

Matched source
4147/22
Project type
One-off house
Coverage
5 km radius
12,457Nearby applications
13%Refused
10,832Conditional grants
3Refusal reasons

Top refusal reasons nearby

Design1
Procedure Invalid1
Residential Amenity1

Nearest similar decisions

4147/22

RETENTION: The development consists of the retention for a temporary period of 5 years of a liquid oxygen compound previously part approved (for a temporary period under Reg. Ref. 3040/16) comprising of: a VIE (vacuum insulated evaporator) liquid oxygen primary tank (40,000 litres) of 8.15m in height; 2 no. back-up VIE liquid oxygen tanks (3,000 litres and 10, 500 litres) of 4.38m and 4.9m in height respectively; vapourisers (5.7m in height), concrete plinth, hardstanding area, concrete ramp, aluminium palisade fencing and security fencing (reconfigured from that previously approved); and all other site development works above and below ground required to facilitate the entire development.

Granted0.0 km26 July 2022
3357/25

The development will consist of: i) the amalgamation of the ground floor retail units to provide for a single retail unit (c.575 sq.m GFA) including an ancillary alcohol sales area (c.32 sq.m); (ii) minor external alterations to the elevations to include automatic sliding entrance door, signage, vinyl window coverings and louvered screens to the internal plant room on the Reuben Street (front) elevation; signage to the James's Walk (side) elevation; and louvered screens to the internal plant room on the Herberton Street (side) elevation; and (iii) all ancillary site services and site development works. The development will also consist of the provision of a loading bay on James's Walk.

Granted0.1 km15 October 2025
WEB1521/20

RETENTION: The Retention Permission to retain the two storey flat roof extension to the rear and the flat roof dormer window in rear elevation roof plane.

Granted0.1 km14 September 2020
2622/19

Planning permission for development at this site, the I.B.T.S. Headquarters, the National Blood Centre, St. James's Hospital, James' Street, Dublin D08 NH5R. The development located within Strategic Development and Regeneration Area 15, will consist of the replacement of a 4.24 meter high, 3.66m diameter Liquid Nitrogen Tank with a new 7.18 meter high, 2.5m diameter Liquid Nitrogen Tank, including all associated site works such as foundation reinforcement and services reconnections, all located within the service compound of the I.B.T.S. property.

Granted0.1 km22 May 2019
WEB1697/25

The development consists of the renewal of the previously approved temporary permission for the use of the approved retail unit as a display sample room for New Children’s Hospital equipment (under Reference 2200/19) for a further period of five years.

Granted0.1 km26 May 2025
2200/19

RETENTION: The development consists of the retention of the use of the approved retail unit as a display sample room for New Children's Hospital equipment for a period of five years.

Granted0.1 km02 April 2019

The full report covers all 12,457 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required