Free preview / €39 incl. VAT site brief

Site planning risk brief

Fix the brief to an Eircode, a dropped pin or a drawn site boundary. PlanIntel then checks the planning register, available spatial layers, appeals and current indexed policy evidence.
See sample PDF

Define the land to check

The report your architect will ask for — here is how it compares with a €49 pre-planning report.
PlanIntel briefPlanningCheck
Price€39 incl. VAT€49
Nearby decisionsUp to 80 detailed (40 refusals + 40 grants)Not stated
AI planning chat5 messages/day freeNone
Saved-site alertsFreeNone
Diageo Brewery bounded by James's Street, Watling Street, Victoria Quay and Steeven's Lane, Dublin 8Opens secure checkout for the €39 incl. VAT site risk brief. Promotion codes can be entered at checkout.
€39 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelSite risk brief preview

Site planning risk brief

Diageo Brewery bounded by James's Street, Watling Street, Victoria Quay and Steeven's Lane, Dublin 8

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

13% of nearby decided applications were refused. The site check found 12,415 decisions within 5 km, 7 exact-site or onsite candidate records, and 1917 structured appeals.

Matched source
4416/22
Project type
One-off house
Coverage
5 km radius

What this site brief can substantiate today

Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.

Applications tied to the site

Partial coverage

7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.

7 matched

Zoning and settlement

Partial coverage

1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.

1 matched

Rural-housing policy

Not yet covered

No verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.

Flood, heritage, ecology and archaeology

Partial coverage

2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.

2 matched

Access, road and wastewater prompts

Partial coverage

0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.

Structured appeal history

Confirmed coverage

1917 structured nearby appeal records.

1,917 matched

Current policy citations

Confirmed coverage

Citations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.

1 matched
12,415Nearby applications
7Site-linked candidates
13%Nearby refused
1,917Structured appeals

Top refusal reasons nearby

Residential Amenity1
Traffic Sightlines1

Nearest planning decisions

4416/22

The description of development is as follows: Removal of existing fence through the site and development of a Nitrogen Generation Plant to produce nitrogen enriched gas for use in the production of beer at a site located centrally within the brewery site. The development will include a lattice style cold box Instillation tower to a height of c. 26m, 2 no. cylindrical storage tanks to a height of c.21m and plant and machinery for the production of nitrogen including a cold box vaporiser installation, a warm end installation, a Lin pump cold box installation, an expander module, cold valves, ambient vaporisers, final control skid and all other associated works. A new fence around the proposed plant is also proposed. The proposal is located within a site which has an approved IE (Industrial Emissions) Licence (Ref No. P0301-04).

Granted0.0 km31 August 2022
4104/21

The proposed development will consist of a new extension to the existing beer processing plant to include a two storey building and six processing tanks. The proposed two storey extension has a total GFA of c. 1,024 sq.m and a building height to parapet level pof c. 14.4 m (20.9m OD). The building will be accessed via ground level doors and serviced through roller shutter doors on the southern elevation. The extension will be designed using new composite brown metal cladding similar to existing building materials within the brewery. The extension has a flat roof with a small plant area (c. 24 sq.m) screened by metal cladding panels and supportive steel frames. Six processing tanks c.24.52m (30.47m OD) are proposed to the north of the proposed extension. These tanks will be smaller than but visually match the existing tanks on site to the east. There will also be associated drainage connections to be made. The proposed development is located centrally within the brewery and is in accordance with the continued use of the site as a brewery. The proposal is located within a site which has an approved IE (Industrial Emissions) Licence (Ref No. P0301-04).

Granted0.0 km18 February 2022
3103/19

Diageo Ireland intend to apply for planning permission (temporary for 5 years) for development withing the existing Diageo brewery production facility at St. James's Gate, toward the northern boundary of the site facing Victoria Quay and the River Liffey, Dublin 8. The development will comprise a temporary storage warehouse (marquee) (675sq.m) and all associated works; all on a site of c.0.0909ha. The proposed development is located within a site which has an approved IE (Industrial Emissions) Licence (Ref No. P0301-04).

Granted0.1 km19 July 2019
4358/19

We, Diageo Ireland, intend to apply for planning permission for development within the existing Diageo brewery production facility at St. James's Gate, at a site centrally located within the St. James's Gate brewery lands bound by St James Street to the south, Watling Street to the east, Victoria Quay to the north and Steven's Lane to the west, Dublin 8. The development will consist of works to an existing industrial building accommodating kegging activities at the brewery comprising: a) Demolition of a single-storey cabin and panel cladding in the south-east corner of the site. b) Relocation of internal storage and welfare rooms at ground floor and internal office floorspace at first floor to a new location within the building on the southern elevation comprising office, workshops, storage, utilities, locker and changing facilities, lobbies and circulation space over ground and first floor. c) A new centrally located control and server room. d) Renovation and re-cladding of parts of the eastern, southern and western elevations comprising: (i) alterations to the eastern elevation including: re-cladding; the infilling of windows and a door; and the provision of a new external access ladder. (ii) alterations to the southern elevation including: external covered stairs to first floor level; re-cladding; new entrance doors including two louvred shutter doors and a smaller louvred goods door; two new windows; ventilation louvres; a canopy above the main pedestrian entrance door; ramped pedestrian access to the south of the building to provide level access as well as a small storage building with canopy above; and gantry style piperack to extend from the southern elevation to connect with the existing piperack. (iii) alterations to the western elevation including: re-cladding; and the provision of an external access ladder. e) A new parapet and railing at roof level on the southern elevation and part of the eastern and western elevations. f) All other associated works. The proposed development is located within a site which has an approved IE (Industrial Emissions) Licence (Ref No. P0301-04).

Granted0.1 km19 December 2019
WEB2472/24

PROTECTED STRUCTURE: The proposed development comprises a 10 year permission for works to facilitate the decarbonisation of the brewery and water recovery on site. Demolition and removal of the Old Keg Plant Building and Export Warehouse (part single storey, part two storey buildings – 6,482m2) and associated works including removal of a section of a steel pipe bridge structure. Construction of an Energy Centre comprising a two storey building containing electrical boiler room LV, MCC and HV Rooms with a primary parapet height of 15.15m and including 3 no. flues to a height of 23.65m (28.1m O.D) and external plant compound (72m2) containing transformer equipment. The overall GFA of the Energy Centre (2) Building is c. 788m2. A blue roof (for rainwater attenuation) is proposed at roof level. Construction of a two-storey Water Recovery Plant (WRP) Building with a primary parapet height of 17.35m containing WRP plant and ancillary staff facilities. The overall GFA of the WRP Building is 1,576m2. A blue roof is proposed at roof level. The Water Recovery Plant also includes the following external plant elements: External Equalisation Tank with height of 13.25m including external access stairway; 2 no. Biogas Scrubbers with a height of 6.3m above parapet level and 1 no. emergency flare at a height of 7.5m above parapet level. 2 no. anaerobic treatment tanks to a height of c. 21m above ground level and external odour control plant. Aerobic treatment aeration tank to a height of 12.04m (+17.33 O.D.) with external access stairway, external renewable Biogas Balloon, other external items including ancillary plant / equipment, enclosing bund walls and circulation infrastructure. Demolition and removal of the former Flaking Plant (c. 46m / 11 storey equivalent in height) located centrally within the site (3,001m2), 1 no. two-storey prefabricated building, 1 no. single storey electrical distribution room, 6 no. single storey cabins / containers, vehicular concrete ramp and section of steel pipe bridge structure (691m2). Construction of a Utilities Hub comprising a proposed split-level building comprising a single storey structure (at lower ground level) ranging in height from 4.2m to 9.2m containing heat pumps, workshop, staff accommodation and ancillary plant, and a single-storey structure (at upper ground level) for use as Energy Centre (1) containing electrical boiler room to a height to parapet level of 8.72m, 2 no. flues to a height of 17.22m above upper ground level and including external plant compounds containing transformer equipment at the upper ground level (258m2), and 3 no. external vessels 15m in height at lower ground level. A blue roof is proposed at roof level. External stairs, ancillary site works, hard and soft landscaping are proposed. The Utilities Hub will comprise a GFA of c. 1,996.2m2. The proposed development includes associated site development works including hard and soft landscaping and the extension of new site services routes (both underground and above ground) including ancillary pipe racks, providing electrical and utilities infrastructure, above and below ground drainage. An additional 26 no. bicycle parking spaces are proposed. The application site is located in the curtilage of a number of Protected Structures. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) will be submitted to the Planning Authority with the planning application and the EIAR and NIS will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority. The proposal is located within a site which has an approved IE (Industrial Emissions) Licence (Ref: P0301-04).

Granted0.1 km14 January 2025
3408/19

Planning permission for development within the existing Diageo brewery production facility at St. James's Gate, at a site centrally located within the St. James's Gate brewery lands bound by James Street to the south, Watling Street to the east and Victoria Quay to the north, Dublin 8. Works to existing industrial building accommodating kegging activities at the brewery comprising: 1) demolition of north-eastern corner of building and annexes, reconfiguration to accommodate 4 no. vehicular loading bays, 1 no. pedestrian door and associated elevation treatment; 2) alterations to northern facade as follows: removal of free-standing staff annexes, recladding, new and reconfigured roller shutter openings (8 no. in total) and pedestrian doors (3 no. in total); 3) new screened plant and safety railings at roof level; and 4) all other associated works. The works also include demolition of existing free-standing double height Fork Lift Truck (FLT) building and associated smaller shed. The proposed development is located within a site which has an approved IE (Industrial Emissions) Licence (Ref. No. P0301-04).

Granted0.1 km27 August 2019

The brief summarizes the pattern across all 12,415 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.

The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.

Exact site history and boundary checks

Site brief

Policy and mapped constraints

Site brief

Appeals and comparable decisions

Site brief

Deterministic risk prompts

Site brief
Ready to get the site risk brief?€39 incl. VAT once-off PDF, no account required