PERMISSION:Proposed 1,407 sq.m. health spa (including ancillary cafe bar). Total area made up as follows: Ground floor: Change of use of existing 609 sq.m. warehouse / workshop building. New 104 sq.m. glazed extension (in existing west facing courtyard). New 39 sq.m. external sauna. First floor: New 580 sq.m. floor area and west facing external open terrace. Second floor: New 75 sq.m, floor area. Also external open terrace area and green roof areas. Also ground floor pedestrian paved area with decorative pool and shelter for 12 bicycles.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
177-179, James Street, Dublin 8
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
13% of nearby decided applications were refused. The preview found 12,046 nearby planning records within 5 km where a location match is available.
- Matched source
- 4439/23
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
Planning permission is sought for amendments to planning permission Reg. Ref. 3444/20 at 180, 182, 183 & 184 James's Street, Dublin 8. Permission is sought for removal of level -3 plant room, removal of level 2 eastern roof top plant room, reduction in area along western boundary and increase in area within courtyard, together with other minor increases and reductions in floor area. Permission is sought to increase the number of bedrooms from 148 bedrooms to 153 no. bedrooms, and for the provision of a kitchen and dining room accessed from the main reception/ lobby/bar area. Together with minor changes to the elevations including changes to signage, retaining wall support structure, additional curtain walling, adjusted window positions and lift over run locations.
The proposed development involves site clearance and levelling works, including the demolition of all existing buildings on site and the construction of a 148 bed hotel that ranges in height between 1 and 7 storeys above three lower ground levels (along the southern part of site) including ancillary staff and guest facilities, plant, storage and waste/refuse storage areas. An ESB substation is proposed at ground floor level at the south-eastern corner of the proposed building. Guest / pedestrian access is provided along the southern frontage onto James Street with Guest Lobby at ground floor. A combination of hard and soft landscaping measures are proposed along all elevations to enhance areas of public realm and ancillary amenity spaces. The proposed building includes for the provision of sustainable drainage measures together with the provision of green roofs. Permission is also sought for associated signage. Development of an aparthotel was previously permitted at this site, under Planning Register 2950/17 & ABP300057-17.
CHANGE OF USE: Maroon Properties Limited intend to apply for planning permission for a development at Bow Bridge Business Centre, Bow Bridge, Kilmainham, Dublin 8, D08 K2NP. The development will include the change of use of an existing 4 storey office block to sheltered accommodation for homeless persons, inclusive of all ancillary site services and minor changes to existing elevations.
The development will include the change of use of an existing 4 storey office block to an early intervention centre/pre-school for children with autism spectrum disorder (ASD). The development will include the following: (i) raising the wall plate level and the ridge height to facilitate raising floors to bring the floor to ceiling heights in line with current building regulations, (ii) altering the window cill and head levels to suit the new floor levels, (iii) internal renovations throughout the building, (iv) all associated site works.
Permission for modifications to previously approved 6-storey apartment development which includes a ground floor commercial unit (Planning. Reg. Ref. 2155/20) at this site: no.25-27 Bow Lane West, Dublin 8, D08 NW89. The modifications will consist of the following: i. General alterations to the floor plans to increase the no. of apartments from 24 no. units (9 no. studio units, 9 no. 1-bed units, and 6 no. 2-bed units) to 27 no. units consisting of 4 no. studio units, 16 no. 1-bed units, 4 no. 2-bed 4-people units and 3no. 2-bed 3-people units. This also includes amendments to the approved common areas (corridors, stairs, lifts), communal open spaces, ancillary areas, landscaping etc. as necessary to suit the proposed alterations. ii. Change of use of commercial unit on ground floor to a 2-bedroom dual aspect apartment. iii. Provision of a communal space on the ground floor. iv. Provision of an external escape stair and exit at the rear of the building. v. Provision of an external secure bicycle storage enclosure. vi. Alterations to the elevations to reflect layout changes, and to omit brick on the internal courtyard and replace with self-coloured render as elsewhere.
Source match
Matched from public planning record 4439/23The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report