Free preview / €39 incl. VAT site brief

Site planning risk brief

Fix the brief to an Eircode, a dropped pin or a drawn site boundary. PlanIntel then checks the planning register, available spatial layers, appeals and current indexed policy evidence.
See sample PDF

Define the land to check

The report your architect will ask for — here is how it compares with a €49 pre-planning report.
PlanIntel briefPlanningCheck
Price€39 incl. VAT€49
Nearby decisionsUp to 80 detailed (40 refusals + 40 grants)Not stated
AI planning chat5 messages/day freeNone
Saved-site alertsFreeNone
Alexandra Quay East and Ocean Pier, off Branch Road South No. 3, Dublin Port, Dublin 1Opens secure checkout for the €39 incl. VAT site risk brief. Promotion codes can be entered at checkout.
€39 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelSite risk brief preview

Site planning risk brief

Alexandra Quay East and Ocean Pier, off Branch Road South No. 3, Dublin Port, Dublin 1

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

12% of nearby decided applications were refused. The site check found 10,957 decisions within 5 km, 2 exact-site or onsite candidate records, and 1643 structured appeals.

Matched source
4919/23
Project type
One-off house
Coverage
5 km radius

What this site brief can substantiate today

Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.

Applications tied to the site

Partial coverage

2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.

2 matched

Zoning and settlement

Partial coverage

1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.

1 matched

Rural-housing policy

Not yet covered

No verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.

Flood, heritage, ecology and archaeology

Partial coverage

2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.

2 matched

Access, road and wastewater prompts

Partial coverage

0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.

Structured appeal history

Confirmed coverage

1643 structured nearby appeal records.

1,643 matched

Current policy citations

Confirmed coverage

Citations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.

1 matched
10,957Nearby applications
2Site-linked candidates
12%Nearby refused
1,643Structured appeals

Top refusal reasons nearby

Residential Amenity2
Visual Amenity2
Density1
Design1
Procedure Invalid1

Nearest planning decisions

4919/23

Permission for amendments to planning permission granted under Reg. Ref. 3859/19. The development will consist of permission for; demolition of the two-storey office building (c.190 sqm); and construction of 2 no. 30m high mast light (HML). The permission for amendments to permission granted at the site under Reg. Ref. 3859/19 will consist of; relocation and replacement of permitted substation (c. 98 sqm) and associated electrical infrastructure with a substation (c. 182 sqm, 4.17m in height) and associated electrical infrastructure; relocation, modification and replacement of 3 no. permitted reefer access gantries (7 no. rows, 14.65m in height) with 4 no. reefer access gantries (7 no. rows, 12.06m in height); and relocation of permitted 30m HML. The proposed development and proposed amendments include all associated ancillary works, encompassing general site clearance, removal of HML, earthworks, pavement reinstatements and construction and drainage services.

Granted0.0 km02 February 2024
3859/19

The development will consist of: demolition of redundant warehouse building known as 'Stack R Warehouse' )c. 6,600sqm); demolition of redundant ESB pumphouse and adjacent switchroom (c. 285sqm) at Berth 31/32 (Ocean Pier); installation of 25 no. new reefer access gantries (5.0m high) at Stack R and McCairn's yard; installation of a new substation (c. 92sqm) adjacent to Stack R; extension of the existing Alexandra Quay East (AQE) Rubber Tyre Gantry (RTG) stack area by 17,500sqm to the west (3 no. bays, 18.2m high); installation of 3 no. new reefer access gantries (7 no. rows, 14.65m high) in the proposed AQE RTG stack extensions; demolition of Dublin Stevedores substation (c. 30 sqm) and installation of new substation (c. 98sqm); re-routing of existing, and installation of new, electrical infrastructure; construction of 1.5m high retaining wall and 4m high security fencing along part of western boundary; provision of 3 no. 30m high mast lighting towers including integrated CCTV cameras; provision of 1 no. 10m high lighting column on the western boundary of McCairn's Yard; provision of ancillary associated lighting and lighting upgrades; installation of new pavement and associated drainage and services; general site clearance; and all associated works on site of c. 75,750sqm (c.7,575ha).

Granted0.1 km18 October 2019
2697/20

The development will consist of alterations to the existing North Wall Power Generating station, which include the replacement of existing indoor gas turbines with new and more efficient indoor gas turbines, the replacement of one of the two existing exhaust chimney stack’s (approx. 70m tall) and its re-construction at a reduced height of 65m to mirror the second existing exhaust stack, the installation of new gas compressors with associated fan coolers, the replacement of existing roof-mounted fan coolers, a fuel oil pumphouse, a demineralised water pumphouse, a new 1,000m3 demineralised water tank (approx. 10m tall), a new 1,000m3 gas oil storage tank (approx. 10m tall), the repurposing of an existing 4,000m3 fuel oil storage tank as a demineralised water storage tank of the same volume, a new fire water tank (approx. 10m tall), a new tanker unloading area comprising a concrete pad, emergency diesel generator, a new administration and welfare building, minor modifications to existing surface water drainage, a new entrance opening on to Alexandra Road and revised internal road layout and minor ancillary plant and equipment structures. The development will also comprise the removal of existing structures including; 70m tall stack and associated boiler, part of the administration building, canteen, stores building and water treatment buildings, gas compressor building as well as a water storage tanks, a bottle storage area and other minor redundant installations. The development will also include all other necessary associated works required to enable the construction and operation of the facility. An Environmental Impact Assessment Report (EIAR) has been prepared and is submitted as part of the planning application. It should be noted that this facility is identified as a Lower Tier site under the COMAH directive, furthermore the facility has an existing Industrial Emissions Licence which is regulated by the Environmental Protection Agency. All required licences and plans will be reviewed as required.

Granted0.2 km17 July 2020
WEB2823/24

The replacement of approximately 52 m of existing 2.4 m high chainlink perimeter fencing and associated access / emergency gates with new 2.4 m high security fencing, gates, 2 no. 8 m CCTV poles and all associated site works.

Granted0.2 km21 February 2025
WEB2497/24

Removal of the existing Tank 3 (378.5 tonnes bitumen) and installing Tank 4C (198.45 tonnes bitumen), also adding horizontal walkway from Tank 2 to portion of spiral stair on Tank 4C and another horizontal walkway linking Tank 4B to Tank 4C.

Granted0.4 km09 January 2025
4152/19

The development consists of: Removal of three bitumen storage tanks of size 60 tonne, 80 tonne & 500 tonne and installation of four bitumen storage tanks of size 50 tonne, 235 tonne, 235 & 15 tonne. Also included is the modification of an existing electrical plant building, modifications include installation of a staircase and additional floor to the building. The new floor of the building will be used as an electrical plant room and will raise the height of the building from approximately 4 metres to 7.3 metres.

Granted0.4 km28 November 2019

The brief summarizes the pattern across all 10,957 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.

The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.

Exact site history and boundary checks

Site brief

Policy and mapped constraints

Site brief

Appeals and comparable decisions

Site brief

Deterministic risk prompts

Site brief
Ready to get the site risk brief?€39 incl. VAT once-off PDF, no account required