Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 4,394 decisions within 5 km, 3 exact-site or onsite candidate records, and 410 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
410 structured nearby appeal records.
410 matchedCitations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.
1 matchedOpen preview
Open preview
Planning Permission for the following: (i) Upgrade to existing Effluent Treatment system to include a new Balance Tank, Screen, DAF and Sludge Tank all located within a new detached Effluent and Control Building to the South of the existing Factory, (ii) Single storey extension to the northern elevation of the existing Factory consisting of a Refrigeration Plant Room and Electrical Room and (iii) all associated site works
The development will consist of: Construction of new two bed detached bungalow total 83sqm, with pitched roof and 4sqm solar panels. All to rear of existing bungalow (No.2), and to be known as 2A Poppintree Cottages with off street parking. Vehicle access is via existing side entrance. All of the above to include new water connection and landscaping with all other services connected to existing.
Planning permission to erect 1,718.00 m2 or 348.44 kW of photovoltaic panels on the roof of the building in our company with all associated site works.
The proposed development will consist of the construction of a hardstand area for the delivery and temporary storage of freight containers and parking of Heavy Goods Vehicles (Total GFA of hardstand works c.32.226m² ), the use of a former car parking area to provide 20 no. staff car parking spaces and the installation of temporary portacabin buildings comprising 1no. security /office hut (c.28m²), 1no. canteen (c.28m²), 1no. toilet block (c.10 m²) and 1no. shower block (c.10 m²) and 2 no. two security gate buildings (26 m²). The development will be accessed via two existing entrances from the Jamestown Road. The northern access is proposed to be entry only while the southern access is proposed to have an entry and exit arrangement.
The development will consist of amendments to Planning Permission Reg. Ref 4457/22 for the construction of a temporary bus depot facilitating the storage, maintenance and dispatch of buses by Dublin Bus, and associated works. The proposed amendments comprise the erection of 4 no. palisade gates (2.4m high) at site entrances and 2 No. palisade fences (2.4m high), and the amendment of condition 13 so that the hours of operation will run from 04:00 to 01:00 each day
Construction of a temporary bus depot to facilitate the temporary storage, maintenance and dispatch of buses by Dublin Bus. The proposed development is intended to facilitate the temporary relocation of buses from existing Dublin Bus depots (in Dublin City) to allow for phased infrastructure upgrades of those existing depots (including electrification of those depots) and will include: (1) construction of a bus maintenance building to provide enclosed daily maintenance routine of bus vehicles and which shall include; (a) internal night service bay, maintenance / inspection pit, cleaning and washing stations and rim cleaning room, (b) stores, parts, tools, compressor and battery charging rooms, (c) maintenance administration rooms, (d) maintenance staff amenities including; kitchenette with seating, locker, washroom and WC; (2) construction of an administration building including (a) depot control, administration and operation offices; (b) driver staff amenities including kitchenette with seating; locker changing, WC; rest and welfare areas; (c) service plant and store rooms, (3) construction of external, pervious, hard surfaces bus parking for provision of circa 178 buses; (4) construction of vehicle inspection hut; (5) staff and service car-parking and 1 no. staff bicycle shelter; (6) modifications to existing site vehicular entrance/egress points onto Jamestown Road including amended road demarcations; (7) 1 no. back-up generator; (8) 2 no. water storage tanks (for fire hydrant and fire sprinkler systems) and associated pump house; (9) 3 no. bounded fuel tanks; (10) 2 no. security/control cabins situated at site entrance and engress; (11) on-site surface water management including attenuation prior to controlled off-site discharge via hydrocarbon petrol interceptor to existing public surface water mains on Jamestown Road; (12) connection to existing water and foul water mains on Jamestown Road; (13) lighting stands; (14) provision of noise attenuation barrier on western (Jamestown Road) site boundary; (15) signage; (16) landscaping including; erection of new perimeter fencing and planting: (17) all associated site development works
The brief summarizes the pattern across all 4,394 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record WEB1436/25The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief