Free preview / €39 incl. VAT site brief

Site planning risk brief

Fix the brief to an Eircode, a dropped pin or a drawn site boundary. PlanIntel then checks the planning register, available spatial layers, appeals and current indexed policy evidence.
See sample PDF

Define the land to check

The report your architect will ask for — here is how it compares with a €49 pre-planning report.
PlanIntel briefPlanningCheck
Price€39 incl. VAT€49
Nearby decisionsUp to 80 detailed (40 refusals + 40 grants)Not stated
AI planning chat5 messages/day freeNone
Saved-site alertsFreeNone
8D, Ballybough Avenue, Dublin 3Opens secure checkout for the €39 incl. VAT site risk brief. Promotion codes can be entered at checkout.
€39 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelSite risk brief preview

Site planning risk brief

8D, Ballybough Avenue, Dublin 3

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

12% of nearby decided applications were refused. The site check found 12,425 decisions within 5 km, 19 exact-site or onsite candidate records, and 1622 structured appeals.

Matched source
WEB1591/20
Project type
One-off house
Coverage
5 km radius

What this site brief can substantiate today

Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.

Applications tied to the site

Partial coverage

19 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.

19 matched

Zoning and settlement

Partial coverage

1 of 2 layers are loaded for Dublin City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.

1 matched

Rural-housing policy

Not yet covered

No verified rural-housing citation is loaded for Dublin City Council, so this brief makes no current policy claim and relies on decision history.

Flood, heritage, ecology and archaeology

Partial coverage

2 of 4 layers are loaded for Dublin City Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.

2 matched

Access, road and wastewater prompts

Partial coverage

0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.

Structured appeal history

Confirmed coverage

1622 structured nearby appeal records.

1,622 matched

Current policy citations

Confirmed coverage

Citations are current-dated and carry policy name, section, page and source URL from the Dublin City Council development plan.

1 matched
12,425Nearby applications
19Site-linked candidates
12%Nearby refused
1,622Structured appeals

Top refusal reasons nearby

Visual Amenity1

Nearest planning decisions

WEB1591/20

Retention Completion Permission & Planning Permission For development at this site No.8D Ballybough, Avenue, Ballybough, Dublin. D03 V6P9 The development will consist of retention completion permission for new rear single storey extension and new windows in existing gable at ground floor Level and also permission for internal modifications and attic conversion with rear dormer window and removal of chimney.

Granted0.0 km15 October 2020
WEB1736/23

Works to include; demolition of existing single-storey extension to rear of existing dwelling and construction of replacement single-storey extension comprising open-plan kitchen / dining area and adjacent WC. All along with associated landscaping and site works.

Granted0.1 km26 October 2023
5231/22

RETENTION: Retention of change of use of No. 27 Ballybough Road from commercial at ground floor (retail) and first floor (ancillary storage) levels to provide residential use and all associated works necessary to facilitate the development. The completed works have allowed for the creation of 1 no. one-bedroom duplex apartment.

Granted0.1 km18 January 2023
4167/19

The development will consist of: an attic conversion with a new dormer roof with 2 new windows to the rear, and 2 Velux type roof windows to the front.

Granted0.1 km02 December 2019
3600/19

The development will consist of an attic conversion, with a rear facing dormer roof to the main and return attics, with 2 new windows to the rear and 2 velux type windows to the front.

Refused0.1 km18 September 2019
2656/21

The proposed development involves the demolition of all existing structures on the site comprising the former Annesley Motors car showroom and associated buildings and vacant dwellings and commercial premises at Nos. 20 to 26 (inclusive) Ballybough Road. The construction of a two storey (including mezzanine floor), neighbourhood centre development with a gross floor area totalling 2,391 sqms. The site area extends to circa 0.28 hectares. At ground floor, the proposed development includes three units (unit 1 – retail; unit 2 – retail/café; and, unit 3 – retail); undercroft parking for 29 cars and 16 external spaces; secure cycle store for staff within the undercroft; loading bay; existing ESB substation on O’Sullivan Avenue to be integrated into the development (a future ESB substation location is also proposed within the car park to the rear of the site should be the existing substation need to be decommissioned by ESB); an additional new ESB substation to service the proposed neighbourhood centre is also located internally within the building; other plant rooms and ancillary space; service vehicle and car access is off Clonliffe Avenue to the south of the site. At first floor, accessed by escalator/stair and lift core, is the licensed discount food store (supermarket) with a net sales area of 1,139 sqms including an off license sales area at first floor level with ancillary, office, storage and food preparation areas. The mezzanine level includes staff facilities ancillary to the supermarket. At roof level there will be both green roof, photovoltaic panels and a mechanical plant compound. The development includes all new drainage infrastructure, and all other works, including landscaping (hard and soft to the rear car park) and boundary treatments required to complete the development. The treatment of the roadside footpath area around outside of the application site is included on the submitted plans for indicative purposes only.

Granted0.1 km28 October 2021

The brief summarizes the pattern across all 12,425 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.

The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.

Exact site history and boundary checks

Site brief

Policy and mapped constraints

Site brief

Appeals and comparable decisions

Site brief

Deterministic risk prompts

Site brief
Ready to get the site risk brief?€39 incl. VAT once-off PDF, no account required