PERMISSION/RETENTION: 1) Permission for construction of a new extension to the south of existing production facility, to include a high-care production area, first-floor office accommodation, a storage and picking area, and plant room together with a new yard for truck and van deliveries. 2) Permission for construction of a new refrigeration plant room to the west of the new extension. 3) Permission to extend the existing car park to the east of the site by 20 spaces. 4) Retention Permission of existing temporary modular production rooms, located to the south of the existing facility, and associated site works. These temporary structures will be removed upon completion of the proposed extension. 5) Retention Permission of approximately 122 linear metres of razor wire, installed over existing mesh fencing along the eastern boundary of the site, commencing at the north-eastern corner. 6) Permission for the installation of razor wire over the existing smoking shelter located adjacent to the site entrance. 7) Retention Permission of an increased height-approximately 2.1m to 3.3m-of 35 metres of palisade fencing connecting to the mesh fence at the south-eastern corner of the site. 8) Permission to increase the height of the remaining palisade fencing from 2.1m to 3.3m along the remaining southern boundary of the site extending to the south-west corner. 9) All associated site development works and services.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
IDA Industrial Park, Poppintree, Finglas, Dublin 11, D11 F851
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
10% of nearby decided applications were refused. The preview found 4,694 nearby planning records within 5 km where a location match is available.
- Matched source
- WEB2866/25
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
The development will consist of a 5-storey apartment development comprising of 36 no. apartment units (1 no. accessible 1-bed apartment, 5 no. 2-bed apartments and 30 no. 1-bed apartments) with private ground floor gardens and upper level balconies on all elevations, with a total gross residential floor space of 2565.66 sq.m. The development includes 36 no. bicycle spaces, landscaping, site development and all associated ancillary works on a site totally 0.2 Ha.
The proposed development will consist of the construction of a hardstand area for the delivery and temporary storage of freight containers and parking of Heavy Goods Vehicles (Total GFA of hardstand works c.32.226m² ), the use of a former car parking area to provide 20 no. staff car parking spaces and the installation of temporary portacabin buildings comprising 1no. security /office hut (c.28m²), 1no. canteen (c.28m²), 1no. toilet block (c.10 m²) and 1no. shower block (c.10 m²) and 2 no. two security gate buildings (26 m²). The development will be accessed via two existing entrances from the Jamestown Road. The northern access is proposed to be entry only while the southern access is proposed to have an entry and exit arrangement.
The development will consist of amendments to Planning Permission Reg. Ref 4457/22 for the construction of a temporary bus depot facilitating the storage, maintenance and dispatch of buses by Dublin Bus, and associated works. The proposed amendments comprise the erection of 4 no. palisade gates (2.4m high) at site entrances and 2 No. palisade fences (2.4m high), and the amendment of condition 13 so that the hours of operation will run from 04:00 to 01:00 each day
Construction of a temporary bus depot to facilitate the temporary storage, maintenance and dispatch of buses by Dublin Bus. The proposed development is intended to facilitate the temporary relocation of buses from existing Dublin Bus depots (in Dublin City) to allow for phased infrastructure upgrades of those existing depots (including electrification of those depots) and will include: (1) construction of a bus maintenance building to provide enclosed daily maintenance routine of bus vehicles and which shall include; (a) internal night service bay, maintenance / inspection pit, cleaning and washing stations and rim cleaning room, (b) stores, parts, tools, compressor and battery charging rooms, (c) maintenance administration rooms, (d) maintenance staff amenities including; kitchenette with seating, locker, washroom and WC; (2) construction of an administration building including (a) depot control, administration and operation offices; (b) driver staff amenities including kitchenette with seating; locker changing, WC; rest and welfare areas; (c) service plant and store rooms, (3) construction of external, pervious, hard surfaces bus parking for provision of circa 178 buses; (4) construction of vehicle inspection hut; (5) staff and service car-parking and 1 no. staff bicycle shelter; (6) modifications to existing site vehicular entrance/egress points onto Jamestown Road including amended road demarcations; (7) 1 no. back-up generator; (8) 2 no. water storage tanks (for fire hydrant and fire sprinkler systems) and associated pump house; (9) 3 no. bounded fuel tanks; (10) 2 no. security/control cabins situated at site entrance and engress; (11) on-site surface water management including attenuation prior to controlled off-site discharge via hydrocarbon petrol interceptor to existing public surface water mains on Jamestown Road; (12) connection to existing water and foul water mains on Jamestown Road; (13) lighting stands; (14) provision of noise attenuation barrier on western (Jamestown Road) site boundary; (15) signage; (16) landscaping including; erection of new perimeter fencing and planting: (17) all associated site development works
Planning permission to erect 1,718.00 m2 or 348.44 kW of photovoltaic panels on the roof of the building in our company with all associated site works.
Source match
Matched from public planning record WEB2866/25The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report