Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Bear Lodge, 8 Ballybride Manor, Ballybride Road, Shankill, Dublin, D18A4E0

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

17% of nearby decided applications were refused. The preview found 3,356 nearby planning records within 5 km where a location match is available.

Matched source
D21B/0077
Project type
One-off house
Coverage
5 km radius
3,356Nearby applications
17%Refused
2,791Conditional grants
98Refusal reasons

Top refusal reasons nearby

Residential Amenity19
Design13
Other13
Traffic Sightlines11
Visual Amenity10

Nearest similar decisions

D21B/0077

Permission for change of use of existing ground floor

Granted0.0 km19 May 2021
D20A/0821

Permission for change of use

Refused0.0 km08 January 2021
D20A/0942

Permission for development. The development will consist of the construction of 61 no. residential units consisting of 10 no. three storey four bedroom terraced houses within two terraces of five houses each; 20 no. dwellings within a three storey terrace (10 no. 2 bed ground floor apartment units and 10 no. own door 3 bed duplex units at first and second floor; and 31 no. apartments (22 no. two bed and 9 no. 3 bed units) within two apartment blocks to the south of the site. Block A (adjacent to Ballybride Road) will contain 12 no. apartments and will be two / three storey over basement; and Block B will contain 19 apartments and will be four / five storey over basement in height. The development will consist of creating a new vehicular entrance off the Ballybride Road to provide access to the 87 no. car parking spaces of which 49 no. will be provided at surface; and 38 no. within the basement under Block A and B. There are 155 no. bicycle parking spaces proposed to serve the development of which 93 spaces will be provided at ground floor within Block B, 50 spaces within two bike store to the rear and front of the duplex terrace and 12 spaces at surface. The development will also consist of new pedestrian access points off the Ballybride Road and off the pedestrian pathway (Lordello Road) to the south. The development will include a new foul and water drainage connection and all associated site development works above and below ground, including landscaping throughout the site that includes informal play areas as well as all ancillary and site development works.

Premature ServicesDesignOther
Refused0.1 km17 February 2021
D17B/0583

Permission to connect the existing garage to the single storey house and convert

Granted0.1 km10 May 2018
D22A/0742

Permission is sought for change of use/conversion of existing two storey garage adjacent and connected to existing house into a seperate dwelling of 138sqm, together with all site works & new utility connections.

Refused0.1 km28 November 2022
D25A/0109/WEB

Demolition of the existing dwelling (c.310 m²) and construction of an infill residential development comprising of 4 No, 2 storey, detached, 5 bedroom houses, all on and off site development works, open space, boundary treatments and landscaping with vehicular and pedestrian access to Ballybride Road, all on site of circa 0.53Ha. at Greenacre, Ballybride Road, Rathmichael, Dublin 18, D18X8C8.

Refused0.1 km07 April 2025

The full report covers all 3,356 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required