The development consists of: alterations to the previously approved cycle/pedestrian bridge approved under Reg. Ref. D19A/0181 (ABP Ref. PL06D.305629). Planning permission is sought for (i) increasing bridge width at the southern entrance from 2m to 4m and relocating the existing handrail to facilitate this; (ii) omission of existing steps towards the northern entrance and replacement with guarded planting and provision of new steps with lower landing area; and (iii) provision of 8 no. bird nest boxes around the bridge area. Retention permission is sought for (i) the repositioning of the terminus points within Clonkeen Park and associated alteration to the gradient of the bridge; (ii) alterations to the bridge landing area between the existing buildings (the Highline and the Joinery); (iii) minor separation of central footpaths; and (iv) resurfacing bridge from loose gravel finish to a brushed concrete finish.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Clonkeen Park, Dún Laoghaire, Co. Dublin: Within the curtilage of 'The, Highline' & ‘The Joinery’ (Formerly known as ‘Mentec House’) at, Pottery Road, Dún Laoghaire,, Dun Laoghaire Industrial Estate, Co Dublin
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
13% of nearby decided applications were refused. The preview found 8,440 nearby planning records within 5 km where a location match is available.
- Matched source
- D24A/0400/WEB
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
Minor alterations to cycle/pedestrian bridge approved under D19A/0181 (ABP PL06D.305629) The alterations consist of (i) the repositioning of the terminus points within the Clonkeen Park and associated alteration to the gradient of the bridge, (ii) reduction in width from 4.16 to 2m on the southern bridge element where it terminates in Clonkeen Park. (iii) alterations to bridge landing area between the existing buildings, the Highline and the Joinery. (iv) minor seperation of central footpaths. (v) all landscaping and ancillary works necessary to facilitate the development.
Permission is sought for alterations to approved development Reg. Ref. D19A/0181 (ABP Ref. 305629). Permission is sought to amend Condition No. 6 of Reg. Ref. D19A/0181 (ABP ref. 305629) to require that the approved cycle and pedestrian bridge to Clonkeen Park be completed within 6 months of occupation of the residential apartments.
Permission for: 1. Construction of a new pedestrian footbridge to Clonkeen
Permission for: 1. External and internal alterations to the ground floor of the
Permission for a) double-sided directional signage on Pottery road at the entrance to Dun Laoghaire Industrial Estate and b) miscellaneous directional / information signage in the undercroft of the Highline Building and in the vicinity of same.
The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report