Permission for the erection of a 20m high, freestanding telecommunicat
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Featherbed Lane, Ballykea, Loughshinny, Co Dublin
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
24% of nearby decided applications were refused. The preview found 1,397 nearby planning records within 5 km where a location match is available.
- Matched source
- F17A/0691
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Retention permission is sought for all ground-mounted equipment (including cabinets, boxes, plinths, mini pillars and cable trays) and all pole-mounted equipment: antennae, dishes and equipment including support poles, cables, RRU's, and the lightning finial erected on or ancillary to the 20m high telecommunications monopole mast, including 2 no. ground-mounted equipment cabinets, 6 no. pole-mounted antennae with 9 no. ancillary RRU's, 2 no. mini-pillars, 2 no. cable trays and cable support poles and a multi-meter box all located within ESB Telecoms' Compound.
Permission for the development of a single storey cable landing station, together with associated cabling, plant and ancillary works, enclosed within a palisade fenced compound. Add Info received 20th December 2019.
Planning permission for; A. Subdivision of existing two storey semi detached dormer bungalow into two separate bungalows. B. Widening of existing dished footpath to accommodate necessary off-street parking to service both. C. All associated site works. AI Rcvd 15/11/2024 AI Deemed Significant **Awaiting revised public notices SAI Rcvd 09/12/2024
Permission for (A) outline permission for 4 no. part single storey/par
The proposed development consists of the following; (i) Construction of 3 no. detached dormer rural dwellings. (ii) New vehicular access from Feather Bed Lane, provision of new access driveways and within curtilage parking; (iii) Installation of 3 no. pumping stations. (iv) All associated ancillary works necessary to facilitate the development including, SUDS surface water drainage, site works, boundary treatment and landscaping.
The full report covers all 1,397 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record F17A/0691The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report