Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Site D2, Horizon Logistics Park, Harristown, St Margaret's, Swords, Co

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

10% of nearby decided applications were refused. The preview found 2,644 nearby planning records within 5 km where a location match is available.

Matched source
F17A/0768
Project type
One-off house
Coverage
5 km radius
2,644Nearby applications
10%Refused
2,373Conditional grants
4Refusal reasons

Top refusal reasons nearby

Other2
Visual Amenity2

Nearest similar decisions

F17A/0768

The development will consist of a further extension (3,623m²) to a pre

Granted0.0 km23 February 2018
FW22A/0036

The installation of a photovoltaic solar array to be mounted on the rooftop of an existing industrial building. The proposed development includes the provision of approximately 6245m2 of photovoltaic solar panels, mounting frames, inverters, electrical cabling and all associated ancillary infrastructure.

Granted0.1 km07 April 2022
FW20A/0025

Three illuminated 'Bunzl' identity signs and various other non-illuminated locational and directional signs.

Granted0.1 km04 June 2020
F18A/0457

Permission for the construction of 1 no. warehouse/logistics building

Granted0.1 km25 September 2018
F19A/0033

The erection of a warehouse/logistics unit (D8 14,933m²) on its own se

Granted0.2 km03 May 2019
FW23A/0259

The development will consist of the following:

Granted0.2 km23 October 2023

The full report covers all 2,644 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required