East Pier, Howth Fishery Harbour Centre, Howth, Co. Dublin.
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
17% of nearby decided applications were refused. The preview found 1,063 nearby planning records within 5 km where a location match is available.
- Matched source
- F19A/0287
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
The proposal consists of accessibility and upgrade works to the pier which will link the ferry gangway area, pier head and breakwater areas at the Northernmost end of the West Pier. The works include the excavation of portions of existing mixed asphalt, concrete and granite paved areas along with repair and upgrade of existing drainage and ducting, re-laying to falls and grouting / pointing of existing historic cobble sets (1250 sq. metres). Accessible walkways will be created in silver granite tones with contrasting yellow granite toned infill borders for visually impaired and mobility challenged persons along with the installation of small rectangular paving sets to provide a smooth surface. The new walkway sets will be the same style and colour as the existing silver colour footway paving currently used in the Harbour which will provide visual continuity. AI Received 15/04/2025 CAI received 30/05/25
Applying for planning permission for East Pier Upper Deck Refurbishment, to be carried out on the upper level of the East Pier, a protected structure (RPS 595a), at Howth Fishery Harbour Centre, Howth, Co. Dublin. The proposal consists of removing the existing life expired concrete and rubble surfacing material and replacing with a new smooth accessible concrete surface over 4600 sq.m. and to carry out structural protection works to the rear of buildings that abut the upper deck to give increased storm protection as described in the planning pack. AI Received 15/04/2025
The development consists of planning for part change of use of a seafood school and restaurant to restaurant and function room use at ground floor level, relocation of existing staircase,retention for changes to the front and side elevation consisting of a roller shutter to the front elevation at ground floor, window and glazing to the balcony to the side elevation, at ground and first floor respectively. AI Received 23/01/2023 SAI received 30/01/23
Proposed development works will consist of the following; (i) Dredging of the harbour. (ii) Stabilisation of dredge material. (iii) Reclamation of land on the west side of the West Pier using dredge material. (iv) Construction of an embarkment and rock armour revetment around the perimeter of the reclaimed area. (v) Landscaping of the reclaimed area and provision of pavements, including footways, roadways and parking areas. (vi) Construction of a slipway access to the water. (vii) Provision of storage areas for harbour activities; and (viii) Provision of services, including surface water drainage, mains water supply, lighting, and associated underground ducting. The proposed development consists of work to the West Pier at Howth FCC, a protected structure (RPS 0595b/NIAH 11359040)). The proposed development will require an Industrial Emissions (IE) licence or waste licence from the Environmental Protection Agency. An Environmental Impact Assessment Report (EIAR) has been prepared and will be submitted to the Planning Authority with the application. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application. AI received 2/6/2022 AI deemed significant ** Revised public notices received 13/6/2022
Planning permission is sought at No 5 West Pier, Howth Co. Dublin (a protected structure) by Shona Wright for material change of use at the Former Lifeboat House, from storage use to seafood processing use with ancillary dispatch, & café with eat-in seating. The proposed development works will include: Refurbishment of the fabric of the existing building, fitout of premises to accommodate food preparation and packaging & serving area, replacement of doors, relaying of existing floor to allow for servicing, restoration or repair works on the exterior of the building (as necessary); repair and replacement of doors, new signage and all associated site development works necessary to facilitate the proposed development. Additional Information received 23/04/26
The full report covers all 1,063 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record F19A/0287The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report