For a two-storey extension, alteration to the existing school and all associated site works.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
(Gaelscoil Bhaile Brigin), Castlelands, Balbriggan, Co. Dublin.
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
20% of nearby decided applications were refused. The preview found 794 nearby planning records within 5 km where a location match is available.
- Matched source
- F19A/0552
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Permission sought for the change of use of existing 2 storey vacant Pu
The construction of 38 No dwellings units, comprising of 12 No 2 store
Change of use from Doctor's Surgery to a health and fitness centre.
Permission for remediation of the eastern wing of the existing school, which extends over three floors, comprising replacement of its existing external walls, windows and doors, and the reconfiguration of its entrance, construction of a new single- storey extension to the construction studies room on the north side of the ground floor, measuring 21 m2, and associated site works.
Changes to previously granted Planning Permission F19A/0361 for the installation of a single storey prefabricated temporary accommodation building. The proposed changes to comprise the addition of a second storey containing 4 no. general classrooms, sanitary facilities, internal accommodation stairs and external fire escape stairs, along with changes to the proposed elevations.
The full report covers all 794 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record F19A/0552The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report