Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Terminal 1 & Terminal 2 Forecourts, Townlands of Corballis and Collins

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

12% of nearby decided applications were refused. The preview found 3,218 nearby planning records within 5 km where a location match is available.

Matched source
F20A/0455
Project type
One-off house
Coverage
5 km radius
3,218Nearby applications
12%Refused
2,846Conditional grants
0Refusal reasons

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest similar decisions

F20A/0455

Permission for alterations to sections of the existing internal road network and associated works, on the Departures routes to and from Terminal 1 and Terminal 2 forecourts in the townlands of Corballis and Collinstown, Dublin Airport, Co. Dublin. The proposed development will include the reconfiguration of the 2 no. existing exit lanes from both the Terminal 1 and Terminal 2 fourcourts to provide 4 no. new exit lanes, and all associated works including pay cabinets, staff control reader, control barrier, flexi bollards, automatic number plate recognition cameras, CCTV cameras, and 2 no. cantilever columns with lane guidance signage, new fencing, new kerbs, new/realigned footpaths and cycleways, relocated lighting columns, and traffic islands. The proposed reconfigured exit lanes from the Terminal 1 and Terminal 2 forecourts will also have 1 no. lane for buses and taxis. The proposed reconfigured exit lanes from the Terminal 1 forecourt will have 1 no. lane including control barriers for emergency vehicles only. The proposed reconfigured exit lanes from the Terminal 2 forecourt will also involve the closure of the existing access/egress into the existing Terminal 2 short-term surface car park and the provision of a new access/egress, barrier, a CCTV camera and pay cabinet; a proposed concrete median to tie into the existing median; the internal rearrangement of the existing Terminal 2 short-term surface car park; and removal of an existing pedestrian crossing and provision of a new pedestrian crossing. There will be no increase in short-term car-parking spaces. The proposed development will also include the erection of advance traffic direction, fee information signage and road markings, and all associated site development, drainage and landscaping works. The proposed development will also include the reconfiguration of the existing car parking layout on part of the central section of the Express Red Long-Term Car Park in the townland of Toberbunny, Dublin Airport, Co. Dublin including the provision of a proposed entry lane, pay cabinet, bollards, automatic number plate recognition camera, staff control reader, and CCTV camera; relocated security hut; provision of new egress with a proposed exit barrier, CCTV camera and pay cabinet; and all associated site development, landscaping, and fencing works, to facilitate a free temporary waiting zone with 185 no. surface car parking spaces (including 5 no.PRM parking spaces). Add Info received 8th January 2021. Add Info deemed SIgnificant 12th January 2021. Revised Public Notices received 19th January 2021.

Refused0.0 km15 February 2021
F21A/0518

Planning permission for development which will consist of alterations to section of the existing internal road network and associated works, on the Departures routes to and from the Terminal 1 and Terminal 2 forecourts in the townlands of Corballis and Collinstown, Dublin Airport, Co. Dublin. The proposed development will include the reconfiguration of the 2no. existing exit lanes from both the Terminal 1 and Terminal 2 forecourts to provide 4no. new exit lanes, and all associated works including pay cabinets, staff control reader, control barrier, flexi bollards, automatic number plate recognition cameras, CCTV cameras, and 2no. cantilever columns with lane guidance signage, new fencing, new kerbs, new/realigned footpaths and cycleways, relocated lighting columns, and traffic islands. The proposed reconfigured exit lanes from the Terminal 1 and 2 forecourts will also have 1no. lane for buses and taxis. The proposed reconfigured exit lanes from the Terminal 1 forecourt will have 1no. lane including control barriers for emergency vehicles only. The proposed reconfigured exit lanes from the Terminal 2 forecourt will also involve the closure of the existing access/egress into the existing Terminal 2 short-term surface car park and the provision of a new access and new egress, barrier, a CCTV camera and pay cabinet; a proposed concrete median to tie into the existing median; the internal rearrangement and change of use of the existing Terminal 2 surface car park (291no. spaces) to provide 245no. long-term car parking spaces, 17no. van parking spaces, and 20no. short-term car parking spaces; and the removal of an existing pedestrian crossing and provision of a new pedestrian crossing. The proposed development will also involve the erection of advance traffic direction, fee information signage and road markings, and all associated site development, drainage and landscaping works. the proposed development will also involve the reconfiguration of the existing car parking layout on part of the central section of the Express Red Long-Term Car Park in the townland of Toberbunny, Dublin Airport, co. Dublin including the removal of 206no. long-term car parking spaces; the provision of a proposed entry lane, pay cabinet, bollards, entry barrier, automatic number plate recognition camera, staff control reader, and CCTV camera; relocated security hut; provision of new egress with a proposed exit barrier, CCTV camera and pay cabinet; and all associated site development, landscaping and fencing works, to facilitate a time-limited free waiting zone incorporating 100no. short-term car parking spaces (including 4no. PRM waiting spaces). AI received 20/12/21 CAI Received 04/02/2022

Granted0.0 km03 March 2022
F21A/0594

Permission for continuation of use of the existing site office structure at "The Green", Dublin Airport Central, Dublin Airport, Swords, Co Dublin, K67 X4X5. The application seeks permission for the continuation of the existing use of the structure as a Covid Testing Centre for a period of up to 3 years.

Granted0.1 km04 January 2022
F24A/0139

The proposed development will consist of the erection of 2 No. illuminated signs mounted on the building's South facing parapet wall, and all associated works. The two signs will read 'Kellanova' and 'DAA' and will be placed on the top right and top left corners of the South elevation, respectively. Both signs will be of similiar size at c.1.5m in height (max) and 7.5 m in width (max) and will project out c. 0.4m from the parapet wall.

Granted0.1 km17 April 2024
F19A/0302

Minor alterations and retention of as built elements of the under cons

Granted0.2 km03 September 2019
F23A/0707

Permission to amend a previous permitted development (Fingal County Council reg ref F21A/0255) located at Dublin Airport. The development proposed under the subject application relates specifically to Site A - Hotel Site. The development permitted on Site B, Site C and Site D is unaffected by this planning application. The proposed development, which provides for alterations to the permitted hotel development, comprises: the reconfiguration of the internal layout of all Levels of the permitted building (from Ground to Eleventh Floor Levels), to include amendments to the hotel bedrooms and related ancillary hotel facilities including entrance lobbies and reception spaces, meeting rooms, event / business space (with ancillary related spaces and public bar), administration, security office and staff facilities, restaurant with bar (and ancillary related spaces), leisure centre (including reception area and related facilities such as changing rooms, gym, treatment rooms, sauna, steam room and vitality room), toilets, waste storage area, bicycle store, ancillary space (which includes areas such as circulation cores (lifts and stairs) and routes, plant areas and storage areas throughout the building, electrical substations and switchrooms, toilets and shower areas etc.), and the omission of the permitted children's play room (kids club) and private dining area alterations to the Eleventh Floor Level's public bar's and executive lounge's south facing terrace; an increase in the size of the permitted retail unit by 9 sq m - from c. 188 sq m permitted to c. 197 sq m proposed); alterations to the permitted building's elevations; alterations to the permitted plant areas at Eleventh Floor Level and at Roof Level (and associated relocation of the roof plant screen, where required), including the relocation of the permitted weather radome and associated equipment room at Roof Level; and associated alterations to permitted hard and soft landscaping and permitted scheme's site services (mechanical and electrical, water supply, sewage disposal and surface water disposal), all on a proposed larger site area of 0.4859 for Site A (0.4715 ha permitted). The development also consists of the provision of a dedicated covered one-way service route to the rear of the permitted building at Ground floor Level, with associated automatic security roller shutters, intercom pillar and service area. Service route and yard access will be via the existing Terminal 2 Multi Storey Car Park access road, with egress will be via the Terminal 2 Multi Storey Car Park exit road in the west. The permitted designated drop-off / layby at the front of the hotel continues to be provided. The proposed development results in an increase in the permitted building's height (excluding weather radome) (from c. 41.5m permitted to c. 41.8m proposed) and alterations to the permitted extents of the building floorplates. The proposed development also results in an increase in the gross floor area of the permitted Ground, Second and Eleventh Floor Levels by c. 353 sq m in total (from c. 6,804 sq m floor area total permitted across these levels, to c. 7,157 sa m floor area total proposed across these levels), and a decrease in the size of the permitted First Floor Level by c. 5 sq m gross floor area (from c. 3,101 sq m floor area total permitted, to c. 3,096 sa m floor area total proposed) (there is no change proposed to the permitted gross floor areas of the Third, Fourth, Fifth, Sixth, Seventh, Eighth, Ninth and Tenth Floor Levels (c. 2,384 sq m floor area for each level or c. 18,784 sq m in total permitted)). The total gross floor area of the hotel building increases by c. 348 sq m (from c. 28,689 sq m permitted to c. 29,037 sq m proposed) with an increase in the number of hotel bedrooms from 410 No. permitted to 412 No. proposed.;Site B - Skybridge House (former TASC Building), Dublin Airport, townland of Collinstown, Co. Dublin; Site C - Site Compound 1 is bounded by the T2 Departure Road to the west and T2 Multi-storey Car Park to the east, Dublin Airport, townland of Corballis, Co. Dublin; and Site D - Site Compound 2 is located to the east of Swords Rugby Club in the townland of Stockhole, Co. Dublin.

Granted0.2 km23 January 2024

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required