Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
31% of nearby decided applications were refused. The site check found 294 decisions within 5 km, 1 exact-site or onsite candidate record, and 31 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Fingal County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matched2 current citations from the Fingal County Council development plan, each with section, page and source URL.
2 matched3 of 4 layers are loaded for Fingal County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
31 structured nearby appeal records.
31 matchedCitations are current-dated and carry policy name, section, page and source URL from the Fingal County Council development plan.
2 matchedOpen preview
Open preview
The refurbishment and reuse of an existing vernacular dwelling house a
Partial demolition of existing dwelling, new 2 storey extension with single storey link to existing dwelling, new 2 bay garage with home office in loft, replace existing septic tank with proprietary waste water treatment system, SuDS drainage and all associated site works. Significant further information/revised plans submitted on this application
Construction of new single storey extension and creation of new single
A) Two storey extension to the side and rear of existing dwelling with
Construction of new single storey garage to the rear and side of the p
The development will consist of: Extraction and processing on site, to include washing (with associated closed system silt settlement lagoons), screening and crushing; storage; stockpiling and haulage of sand and gravel to principally service the existing readymix concrete plant operated by Kilsaran Concrete on the eastern side of the R108 regional road and permitted under P. Ref. 80/572; The total extraction area extends to an area of c.6.9 hectares and will be worked (extracted and restored) on a phased basis; Phased stripping and storage of topsoil and overburden materials for reuse in the restoration works. Restoration of the site will be to a beneficial agricultural after-use; Access to the site will be through the existing agricultural enterprise site entrance onto the R108 regional road with upgrade of same and provision for the upgrade of the existing internal access track and section of a new access track; All associated site works within an overall application area of c.17 hectares, and all for a period of 9 years plus 1 year to complete restoration works (total duration of 10 years). An Environmental Impact Assessment Report (EIAR) has been prepared in respect of this planning application. Significant further information/revised plans submitted on this application
The brief summarizes the pattern across all 294 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record F21A/0107The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief