Demolition of the conservatory to the rear and construction of an extension to the rear, conversion of the garage and attic space, including 2 dormer windows, the widening of the vehicle access and all necessary site works.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
'Trewhfa', 114 Ard na Mara, Malahide, Co Dublin, K36 RW54
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
14% of nearby decided applications were refused. The preview found 2,708 nearby planning records within 5 km where a location match is available.
- Matched source
- F21A/0305
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
The development will consist of the construction of a new garden shed and gym located in the back garden and all associated site works.
New porch way to the side of the existing house, a new extended kitchen / living area at the ground floor level to the rear of the existing house, new roof over the existing converted garage, attic conversion including dormer windows and associated works.
The construction of 2 no. dormer windows to the north side of the existing pitched roof and minor alterations.
A) A proposed new dormer widnow and increading the size of the existin
Planning Permission for (1) change of use of existing attic to accommodate 3 no. bedrooms and a bathroom (2) a two-storey extension to the side elevation (facing Southwest) with windows facing to the front and rear (3) a first floor flat roofed dormer extension with opaque window to the side elevation (facing Northeast) (4) Window to the first floor existing front gable and all associated and ancillary site works.
Source match
Matched from public planning record F21A/0305The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report