Provision of: A) New flood lighting on 18m high steel posts around existing grass pitches; B) Horizontal extension to existing ball catchment nets on steel posts on the southern boundary, 16mx13m high; C) Replacement ball catchment nets 50mx18m high on steel posts on southern boundary: D) 1.1m high steel crowd separation barrier to the east and west of Pitch 1; E) New 2-4m wide Community walking track around existing pitches; F) Replacement of 4no. steel goal posts 6.5x2.44mx11m high at various locations around existing pitches; G) 2no. new shelter canopies: 50mx4mx2.5m high and 20mx4mx2.5m high to the east and west of Pitch 2; H) New 1.2m high steel post & wire fence around 4no. sides of Pitch 2; |) 5m vertical extension to existing ball catchment nets to eastern boundary of Pitch 3 along Park Road, new height 18m; and all associated site works.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Aras Naomh Maur, Kenure Park, Rush, Co Dublin
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
25% of nearby decided applications were refused. The preview found 1,139 nearby planning records within 5 km where a location match is available.
- Matched source
- F21A/0637
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Removal of existing single storey prefab classroom and replacement with a new temporary 2 storey prefab with 2 no. classrooms and resource room and all site development works. Add Info received 20th December 2019.
Retention for 4 No. temporary pre-fabricated structures which have exp
Provision of an All-weather pitch
Construction of a dormer bungalow dwelling with garage and installatio
The development will consist of an educational campus composed of two schools: (A)- The Construction of a three storey 1000 pupil post primary school for St Joseph’s Secondary School comprising of teaching spaces, ancillary spaces, physical education hall facility, special education needs unit, general purpose hall, social areas, library, administration areas, toilet and changing facilities, external stores, and associated ancillary accommodation with a total internal area of circa 10924.300m². (B)- The Construction of a two-storey building for Gaelscoil Ros Eo comprising of teaching spaces, ancillary spaces, special education needs unit, general purpose hall, social areas, library, administration areas, toilet and changing facilities, external stores, and associated ancillary accommodation with a total internal area of circa 3069.00m², Additionally, the development will include all associated site works such as car parking, bicycle parking, shared sports facilities, playing areas, open spaces/landscaping, plant, bin stores, site services, and connections to facilitate the development. There will also be vehicular and pedestrian access to the development via Park Rd. AI Rcvd 07/04/2025 SAI Recvd 29/04/2025
The full report covers all 1,139 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record F21A/0637The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report