The proposed development will consist of the construction of a new vehicle access and agricultural gate to existing land within daa ownership. The access will be c. 4 metres in width and will include a permeable hardstand area. The proposed agricultural gate will be between 1.2 and 1.5 metres in height. The proposed development will also include all ancillary works including site excavation and development works above and below ground. Development on a site of c. 700 square metres.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Dublin Airport, Townland of Pickardstown, Co. Dublin.
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
13% of nearby decided applications were refused. The preview found 2,330 nearby planning records within 5 km where a location match is available.
- Matched source
- F21A/0659
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Planning Permission for removal of existing hangar door and replace with new door and support frame, and all associated works.
Amend the North Parallel Runway (North Runway)(permitted under FCC Reg
A covered walkway over the existing private IAA footpath, linking the two existing air traffic control centres, solar panels on the roof of the covered walkway, new footpath from the new tower service yard to the front entrance and associated site works.
Planning Permission for the following developments: 1. Construction of four aviation-related cargo handling units with ancillary office space: i. Unit 1: c.10,869.7 m² (including 940.9 m² office space) ii. Unit 2: c.9,151.3 m² (including 751.3 m² office space) iii. Unit 3: c.6,024.9 m² (including 497.7 m² office space) iv. Unit 4: c.8,577.7 m² (including 751.3 m² office space) The proposed units will have an overall combined total gross floor area (GFA) of c. 34,623.6 sq.m (alongside ancillary ESB substations, 4 no. security huts with a combined GFA of 30 sqm and pumphouses). The warehouses are c. 12m in height, with the office element being c. 3.3 m in height and located within a landscaped campus on a site of c. 10.7 Ha. 2. Provision of 390 car parking spaces, including 39 EV charging points, 19 accessible spaces, and 39 motorcycle bays. 3. Provision of 230 secure bicycle parking spaces, of which 100 are short stay spaces and 130 are sheltered long stay spaces. 4. Provision of approx. 77 truck parking spaces and 5 van spaces. 5. Hard and soft landscaping, new boundary treatments, including a c. 2m high System Wire Fence to site boundary. 6. Construction of new site entrance onto the R108. 7. Wastewater treatment plant and infiltration area for 250 PE. 8. All necessary site development and engineering and ancillary site works, including provision of ESB substations and switchrooms, sprinkler tanks and pumphouses, bin store and recycle store, lighting, signage, underground services, photovoltaic panel zones at roof level and sustainable drainage systems (SuDS). An Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the planning application.
The construction of 25 no. additional space car park, relocation of ex
The full report covers all 2,330 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record F21A/0659The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report