Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

2no. landside sites, in the townlands of Collinstown, Co. Dublin Airpo

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

11% of nearby decided applications were refused. The preview found 3,432 nearby planning records within 5 km where a location match is available.

Matched source
F24A/0309E
Project type
One-off house
Coverage
5 km radius
3,432Nearby applications
11%Refused
3,043Conditional grants
9Refusal reasons

Top refusal reasons nearby

Design3
Residential Amenity2
Traffic Sightlines2
Other1
Premature Services1

Nearest similar decisions

F24A/0309E

We, daa plc, intend to apply for a temporary 7-year permission for a proposed development at 2no. landside sites (Site A (c. 1.36ha) (including part of the existing Ground Transportation Centre, Atrium Road 1, and Terminal 1 Multi-Storey Car Park (MSCP)) and Site B (c. 1.64ha) (part of the existing Express Red Long-Term Car Park)), in the townlands of Collinstown, Corballis, Rock, Stockhole, and Toberbunny, Dublin Airport, Co. Dublin. The proposed development will consist of the provision of infrastructure to facilitate the charging of electrical busses for Dublin Airport, as follows: Site A (Atrium Rd 1): The development will consist of (1) the installation of 4No. Pantograph Electrical Bus Charger Units, each with 3No. associated power cabinets on Atrium Rd 1; (2) the upgrade of the existing substation 7 which is located internally within the T1 Multistorey Car Park (MSCP) and an upgrade of the existing underground power cable between existing substation 6 and existing substation 7; (3) ducting from the upgraded electrical substation #7 to the proposed pantograph units for both power and comms supply; (4) new paint markings within the existing bus laybys on Atrium Rd 1; and (5) all other associated site development works, including relocation of 2no. existing bus shelters on Atrium Rd 1 and minor internal demolition works within Terminal 1 MSCP. Site B (Red Long-Term Car Park): The development will consist of (1) the construction of an EV bus charging depot; (2) the installation of 1No. Pantograph Electrical Bus Charger Unit with 3No. associated power cabinets in the new bus charging depot; (3) the installation of 8No. EV Bus Chargers (4no. dual chargers and 4no. standard cable connection); (4) the construction of a new electric substation within the proposed EV bus charging depot site; (5) upgrade of the existing electrical substation #10 (internal works only); (6) provision of new electrical cabling and ducting within the proposed EV bus charging depot site and along Eastlands road and on internal circulation roads within the Red Long-Term Car Park, and connection to the existing Medium Voltage (MV) ring main at the junction between the Swords Rd (R132) and Corballis Road South; (7) security gates at the new depot entrance and exit; (8) new surface water drainage system incorporating attenuation; (9) the erection of CCTV equipment, security fencing, lighting, signage, and boundary fencing; and (10) all other associated site development works, including the removal of an existing fence, drainage works, and all hard and soft landscaping. 2no. landside sites (Site A (c. 1.36ha) (including part of the existing Ground Transportation Centre, Atrium Road 1, and Terminal 1 Multi Storey Car Park (MSCP) and Site B (c. 1.64ha) (part of the existing Express Red Long-Term Car Park) in the townlands of Collinstown, Corballis, Rock, Stockhole, and Toberbunny, Dublin Airport, Co. Dublin AI received 23/08/24

Granted0.0 km19 September 2024
F23A/0707

Permission to amend a previous permitted development (Fingal County Council reg ref F21A/0255) located at Dublin Airport. The development proposed under the subject application relates specifically to Site A - Hotel Site. The development permitted on Site B, Site C and Site D is unaffected by this planning application. The proposed development, which provides for alterations to the permitted hotel development, comprises: the reconfiguration of the internal layout of all Levels of the permitted building (from Ground to Eleventh Floor Levels), to include amendments to the hotel bedrooms and related ancillary hotel facilities including entrance lobbies and reception spaces, meeting rooms, event / business space (with ancillary related spaces and public bar), administration, security office and staff facilities, restaurant with bar (and ancillary related spaces), leisure centre (including reception area and related facilities such as changing rooms, gym, treatment rooms, sauna, steam room and vitality room), toilets, waste storage area, bicycle store, ancillary space (which includes areas such as circulation cores (lifts and stairs) and routes, plant areas and storage areas throughout the building, electrical substations and switchrooms, toilets and shower areas etc.), and the omission of the permitted children's play room (kids club) and private dining area alterations to the Eleventh Floor Level's public bar's and executive lounge's south facing terrace; an increase in the size of the permitted retail unit by 9 sq m - from c. 188 sq m permitted to c. 197 sq m proposed); alterations to the permitted building's elevations; alterations to the permitted plant areas at Eleventh Floor Level and at Roof Level (and associated relocation of the roof plant screen, where required), including the relocation of the permitted weather radome and associated equipment room at Roof Level; and associated alterations to permitted hard and soft landscaping and permitted scheme's site services (mechanical and electrical, water supply, sewage disposal and surface water disposal), all on a proposed larger site area of 0.4859 for Site A (0.4715 ha permitted). The development also consists of the provision of a dedicated covered one-way service route to the rear of the permitted building at Ground floor Level, with associated automatic security roller shutters, intercom pillar and service area. Service route and yard access will be via the existing Terminal 2 Multi Storey Car Park access road, with egress will be via the Terminal 2 Multi Storey Car Park exit road in the west. The permitted designated drop-off / layby at the front of the hotel continues to be provided. The proposed development results in an increase in the permitted building's height (excluding weather radome) (from c. 41.5m permitted to c. 41.8m proposed) and alterations to the permitted extents of the building floorplates. The proposed development also results in an increase in the gross floor area of the permitted Ground, Second and Eleventh Floor Levels by c. 353 sq m in total (from c. 6,804 sq m floor area total permitted across these levels, to c. 7,157 sa m floor area total proposed across these levels), and a decrease in the size of the permitted First Floor Level by c. 5 sq m gross floor area (from c. 3,101 sq m floor area total permitted, to c. 3,096 sa m floor area total proposed) (there is no change proposed to the permitted gross floor areas of the Third, Fourth, Fifth, Sixth, Seventh, Eighth, Ninth and Tenth Floor Levels (c. 2,384 sq m floor area for each level or c. 18,784 sq m in total permitted)). The total gross floor area of the hotel building increases by c. 348 sq m (from c. 28,689 sq m permitted to c. 29,037 sq m proposed) with an increase in the number of hotel bedrooms from 410 No. permitted to 412 No. proposed.;Site B - Skybridge House (former TASC Building), Dublin Airport, townland of Collinstown, Co. Dublin; Site C - Site Compound 1 is bounded by the T2 Departure Road to the west and T2 Multi-storey Car Park to the east, Dublin Airport, townland of Corballis, Co. Dublin; and Site D - Site Compound 2 is located to the east of Swords Rugby Club in the townland of Stockhole, Co. Dublin.

Granted0.1 km23 January 2024
F20A/0636

The proposed development shall consist of the construction of a 1-6 storey extension (over lower ground) to the existing hotel consisting of the following: (a) Demolition of part of existing staff room at lower ground level, glazed entrance at ground floor and balconies on the side (south) elevation; (b) Construction of a new leisure facility including swimming pool and gym at ground floor; (c) 55 no. additional hotel bedrooms at 1st to 5th floor levels bringing the total to 284 bedrooms; (d) Plant at lower ground and roof level; (e) New landscaped entrance courtyard; (f) Works to elevation of existing hotel facade including new entrance and canopy; (g) Security hut, bicycle parking, underground attenuation and all associated landscaping, signage, site works and services. AI received 21/07/21 CAI received 26/10/21

Granted0.2 km22 November 2021
F20A/0638

The proposed development shall consist of a new standalone 8-12 -storey (over partial basement) hotel consisting of the following:- a) Kitchen, plant and back of house services at basement level; b) Double height reception, restautant/bar/lounge area at ground floor; c) Kitchen, staff facilities, storage rooms, bin stores and toilets at ground floor; d) Outdoor seating areas at ground floor level; e) 300 no. hotel bedrooms at 1st to 11th floors; f) Plant at roof level; g) New landscaped entrance courtyard between the existing and proposed hotels; h) Coach set down and car drop -off area at entrance to new hotel; i) Reconfiguration of car park to rear of existing hotel; j) Provision of 15 no. car parking spaces in service yard to rear of existing hotel; k0 Security hut, bicycle parking and all assoicated landscaping, signage site works and services. AI received 21/07/21 CAI received 26/10/21

Granted0.2 km22 November 2021
F18A/0311

Permission for removal of existing water storage

Granted0.2 km31 July 2018
F18A/0310

Removal of existing reduntant fuel tank to existing rear plant area

Granted0.2 km27 July 2018

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required