Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Park Rd, Kenure, Rush, Co. Dublin

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

26% of nearby decided applications were refused. The preview found 1,096 nearby planning records within 5 km where a location match is available.

Matched source
F24A/0739E
Project type
One-off house
Coverage
5 km radius
1,096Nearby applications
26%Refused
816Conditional grants
9Refusal reasons

Top refusal reasons nearby

Ecology3
Premature Services1
Residential Amenity1
Rural Housing Need1
Traffic Sightlines1

Nearest similar decisions

F24A/0739E

The development will consist of an educational campus composed of two schools: (A)- The Construction of a three storey 1000 pupil post primary school for St Joseph’s Secondary School comprising of teaching spaces, ancillary spaces, physical education hall facility, special education needs unit, general purpose hall, social areas, library, administration areas, toilet and changing facilities, external stores, and associated ancillary accommodation with a total internal area of circa 10924.300m². (B)- The Construction of a two-storey building for Gaelscoil Ros Eo comprising of teaching spaces, ancillary spaces, special education needs unit, general purpose hall, social areas, library, administration areas, toilet and changing facilities, external stores, and associated ancillary accommodation with a total internal area of circa 3069.00m², Additionally, the development will include all associated site works such as car parking, bicycle parking, shared sports facilities, playing areas, open spaces/landscaping, plant, bin stores, site services, and connections to facilitate the development. There will also be vehicular and pedestrian access to the development via Park Rd. AI Rcvd 07/04/2025 SAI Recvd 29/04/2025

Granted0.0 km22 May 2025
F24A/0066

The proposed development will consist of the construction of 49 no. residential units comprising of 44 no. semi-detached type units (33 no. 3 bed 2 storey houses; 10 no. 3 bed 2.5 storey houses; and 1 no. 4 bed 2.5 storey house), and 5 no. detached type units (2 no. 3 bed 2 storey houses, 1 no. 4 bed 2.5 storey house and 2 no. 4 bed 3 storey houses), all provided with private gardens and associated carparking; bin and bicycle stores; utilisation of the existing vehicular access on Park Road; landscaping; boundary treatments including works to existing boundary treatments including works to existing boundary treatments; public lighting; and all associated site infrastructure and engineering works necessary to facilitate the development. AI received 04/07/24 SAI received 09/07/2024

Granted0.2 km02 August 2024
F24A/0972E

Planning permission is sought by Carroll Estates (Rush) Ltd. for development on lands at Park Road, Rush, Co. Dublin. The development will consist of proposed minor amendments to House Type C (a 3 bed, 2.5 storey semi-detached house type) [Nos. 17, 18, 23, 24, 25 & 26 i.e. 6 no. units in total] previously permitted under Reg. Ref. F24A/0066, with such amendments including roof height, roof profile and elevational changes, extension of the rear first floor over the ground floor to omit the single storey lean-to extension, and all associated works necessary to facilitate the development.

Granted0.2 km18 December 2024
F19A/0520

Retention for 4 No. temporary pre-fabricated structures which have exp

Granted0.2 km18 December 2019
F19A/0134

Removal of existing single storey prefab classroom and replacement with a new temporary 2 storey prefab with 2 no. classrooms and resource room and all site development works. Add Info received 20th December 2019.

Granted0.2 km14 January 2020
F21A/0637

Provision of: A) New flood lighting on 18m high steel posts around existing grass pitches; B) Horizontal extension to existing ball catchment nets on steel posts on the southern boundary, 16mx13m high; C) Replacement ball catchment nets 50mx18m high on steel posts on southern boundary: D) 1.1m high steel crowd separation barrier to the east and west of Pitch 1; E) New 2-4m wide Community walking track around existing pitches; F) Replacement of 4no. steel goal posts 6.5x2.44mx11m high at various locations around existing pitches; G) 2no. new shelter canopies: 50mx4mx2.5m high and 20mx4mx2.5m high to the east and west of Pitch 2; H) New 1.2m high steel post & wire fence around 4no. sides of Pitch 2; |) 5m vertical extension to existing ball catchment nets to eastern boundary of Pitch 3 along Park Road, new height 18m; and all associated site works.

Granted0.2 km28 January 2022

The full report covers all 1,096 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required