The development will consists of: Proposed minor alterations to existing boundary fence, gate and footpath to rear/side of Howth Guard Station. The following works are proposed: 1. Removal of the existing painted palisade fencing and gate; 2. Proposed new palisade fencing to three sides, and gate to new locations as per drawings; 3. Removal of 7.0 m section of brushed concrete footpath and construction of new dished footpath entrance with matching brushed concrete finish; 4. Removal of existing asphalt, gravel and broken concrete finishes to yard at rear of station and resurfacing in brushed concrete with associated drainage works on site. 5. All associated site services, drainage, lighting and landscaping required in conjunction with works.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Howth Coast Guard Station, 12a West Pier, Howth, Dublin 13, D13 VW52
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
17% of nearby decided applications were refused. The preview found 1,181 nearby planning records within 5 km where a location match is available.
- Matched source
- F25A/0051
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Planning permission for a change of use of existing industrial unit to a new fish & chips restaurant. The Development will consist of: 1. New Prep and Kitchen Area. 2. New Bi Fold Door System Entrance. 3. Series of New Velux Roof Lights. 4. New External Signage 5. New Internal seating and Mezzanine 6. External Seating. 7. and all associated site works. AI Rcvd 04/09/2024
The proposed development will consist of removal of existing boundary fencing and steel shipping containers, the construction of a two storey building of 1293 sq.m. and height of 8.125m to parapet (with plant room 2.06m high above parapet). The main use of the building will be for the processing of food (primarily fish) and its storage and distribution. It will include the following: a 74.17 sq.m factory retail outlet for the sale of seafood products produced on site, to the public; ancillary office and welfare facilities; solar panels (approx. 387 sq.m) on the roof; associated site and boundary works. AI received 6/6/2023
Construction of a workshop with Offices and Canteen facilities and a gross internal area of 374sqm. The proposed development is an amendment to a previous granted Planning Ref; F18A/0633.
Construction of a two-storey combined workshop, accommodation
Protected Structure (ref: 0937) Planning Permission is sought by Smart Horizon Ltd. for the remodelling and change of use of the existing semi derelict vacant fish processing and warehouse building to include:- (i) Replacement of non-original windows with new traditional sliding timber sash windows; (ii) Provision of new external doors to replace non- original doors, (iii replacement and renewal of ground floor, first floor, and roof; (iv) New internal stairs; (v) External first floor terrace on steel structure to the rear, including the replacement of window with new access door and escape steel staircase to ground level at rear; (vi) New signage on front facade of building plus wall banner to the front; (vii) change of use from fish processing and warehouse to retail, food to go, and café/restaurant uses at ground and first floor; (viii) Associated ancillary services including drainage, all site works associated with same, at 11 West Pier, Howth, Co. AI Rcvd 02/10/2023
The full report covers all 1,181 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record F25A/0051The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report