Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Greenstar Materials Recovery Facility, Millennium Business Park, Cappa

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

12% of nearby decided applications were refused. The preview found 3,174 nearby planning records within 5 km where a location match is available.

Matched source
FW18A/0016
Project type
One-off house
Coverage
5 km radius
3,174Nearby applications
12%Refused
2,792Conditional grants
12Refusal reasons

Top refusal reasons nearby

Visual Amenity4
Other3
Residential Amenity3
Design2

Nearest similar decisions

FW18A/0016

The proposed development consists of the installation of roof mounted

Granted0.0 km23 March 2018
FW22A/0016

The development for which retention permission is sought consists of the retention of a single storey waste recovery/transfer building. The floor area of the building is 4226 sq.m and the height of the building at its highest from the finished floor level is 13.211m. The retention permission is also required for all associated site works and services.

Granted0.1 km31 March 2022
FW18A/0079

The construction of a single storey waste recovery/transfer building w

Granted0.1 km20 September 2018
FW21A/0208

The development will consist of retention permission for additional offices and staff facilities created at first floor level from that previously granted permission under planning reference no F05A/0225 together with all associated site works.

Granted0.2 km14 December 2021
FW18A/0194

The construction of 4 no. light industrial units with ancillary office

Granted0.2 km17 September 2019
FW25A/0148E

Kilsaran Concrete Unlimited Company intend to apply for permission for development and retention permission for development at an existing concrete batching facility at Kilsaran, Millennium Business Park, Cappagh Road, Dublin 11, D11 R2HE. The proposed development amends Fingal County Council Reg. Ref FW18A/0087 (as extended by Reg. Ref. FW18A/0087/E1), which was subsequently amended by Reg. Ref. FW21A/0032. The development permitted has commenced and is in the process of being implemented. The development for which retention permission is sought consists of modifications to the permitted development as implemented on-site, described as follows: • Covered aggregate triple storage bay that replaces 3 no. previously permitted aggregate storage bays; • Amended design and layout of concrete batching plant (and ancillary, related plant) and concrete reclaimer; • Revised location of 2 no. weighbridges. The weighbridges to be retained do not have cabins; • Amended truck parking layout and an increase in truck parking by 5 no. spaces; • Reduced size of water tank and provision of associated plant and plantroom not previously permitted; • Larger ESB switchroom of c.55.5 sq.m in revised location. The previously permitted ESB substation to be retained as a storage unit; • With associated amendments to be retained to the permitted concrete pavement and tarmac areas, refuelling area, lighting, boundaries and landscape details. The development for which permission is sought consists of amendments to the permitted development comprising: • The relocation and amended design of a previously permitted office. The office has been reduced in size by c. 395.5 sq.m; • The removal of existing storage containers to facilitate an extension of c.191 sq.m to an existing workshop building; • Revised location of a wheelwash; • Alterations to the permitted car park layout and a reduction in car parking from 62 no. spaces to 40 no. spaces including for 2 no. disabled and 5 no. EV parking spaces; • The relocation of a permitted bicycle shelter and an increase in bicycle parking from 10 no. spaces to 20 no. spaces; • The provision of 5 no. e-bike spaces and 5 no. motorcycle spaces; • Amendments to permitted lighting, hard and soft landscaping and boundaries; • All other associated site excavation, infrastructural and site development works above and below ground.

Granted0.2 km29 May 2025

The full report covers all 3,174 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required