Construction of a high bay warehouse/storage facility to the north of 7B for use as 'Goods Outward' building, all ancillary to the use of the existing buildings and activities on site.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Unit 7 (units 7A, 7B & 7C) Northwest Business Park, Ballycoolen (townl
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
12% of nearby decided applications were refused. The preview found 3,236 nearby planning records within 5 km where a location match is available.
- Matched source
- FW21A/0005
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
Demolition of internal fixtures and fittings of ancillary offices to U
The development will consist of the installation of a substation building comprising of an ESB supply room and 1 no. switch room (c. 46 sq.m) within a planning application area of c 0.0046 Ha.
The construction of 4 no. light industrial units with ancillary office
Planning Permission is sought for Alterations to an existing granted planning application Reg. Ref. FW21A/0111 for a proposed Tanker Washing Facility with ancillary Office and Staff Facilities at Cappagh Road, Cappagh Corporate Park, Ballycoolin, Dublin 11, Co. Dublin. The subject alterations for which Planning Alterations is sought for are as follows: 1.A. Reconfiguration of the floor plan areas and inclusion of a pump house, 48m2, 4.15m high, to rear (Northern) yard. Totalling 329m² additional floor area with a total area increase from 1,214m² (previously permitted) to 1,543m² (proposed). 2.A. Elevations alterations associated with above floor area adjustments; B. Proposed 2 No. non-illuminated company logo signage, 3.80m x 2m each, total area of 15.20m2 located 9m above ground floor level on the eastern & western building elevations. 3.Site plan alterations as follows: A. Inclusion of Truck Wash bays to the western boundary; B. Reduction in HGV parking spaces from permitted 34No to 10No HGV parking spaces to the eastern boundary; C. Provision of 2No. Water Tanks 5.00m diameter, 5m high, effective capacity = 98m3 each, to rear (Northern) yard, which will serve the facility building; D. Provision of additional 4No. covered bicycle parking spaces totalling 12No. covered bicycle parking spaces provided. E. Associated change of external surface finishes, landscape and drainage adjustments due to the inclusion of the alterations above; 4.A. Provision of 264No. Solar PV Panel modules with overall area of 570m² to the facility roof only. All other details will remain as per the granted application reg. ref. FW21A/0111.
Permission for a HGV Parking and Tanker Washing Facility, the proposed development will consist of the following: (1) Facility building consisting of: (a) 3 no. Tanker Wash Bays for internal washdown of HGV Tankers (488m², 10.40m high). (b) Associated plant room with pumps and water treatment (241m², 10.57m high). (c) Workshop for maintenance and repair of HGV's (329m², 10.57m high). (d) Attached ancillary single storey Office/Staff facility accommodation (147m², 5.40m high). (2) Secure parking for 34 no. HGV's over a net area of 2,142m² with access and ancillary marshalling areas. (3) Ancillary car parking for 12 no. vehicles and 8 no. bicycle parking spaces. (4) ESB Sub-station 9.0m², 3.0m high located at previously granted cul de sac access road. This development will also include site fencing, HGV and pedestrian gate, boundary treatment - landscaping, paving, external lighting, provision of services and utilities including foul sewer and surface water management facilities. The subject site will be accessed from an existing cul de sac road connected to the existing roundabout on Cappagh Road as previously granted planning permission under FCC file reg. ref. FW19A/0231. AI received 18/02/2022
Source match
Matched from public planning record FW21A/0005The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report