Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Huntstown Townland, Dublin 11

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

12% of nearby decided applications were refused. The preview found 2,679 nearby planning records within 5 km where a location match is available.

Matched source
FW21A/0119
Project type
One-off house
Coverage
5 km radius
2,679Nearby applications
12%Refused
2,359Conditional grants
0Refusal reasons

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest similar decisions

FW21A/0119

The proposed development will consist of an extension to the existing access road as previously permitted under Reg. Ref. FW19A/0226. Provision is also made for a roundabout junction at the eastern end of the new road. The planning application area is c. 1.8 hectares. The development includes for pedestrian footpath and cycle-path links from the existing road; provision of all associated trunk utility services shall be provided to serve the adjacent development lands to include surface water drainage infrastructure, foul water drainage infrastructure, watermains, public lighting and associated ancillary works. The proposed development also includes for a single storey security booth (c.22.9m² and a max height of 3.6m); associated security barriers; and 4 no. parking spaces (1 no. being a disabled parking bay). This infrastructure may be removed prior to or upon the road being taking in charge by Fingal County Council. The new section of the road will provide access to existing lands zoned as Heavy Industry (HI) in the current Fingal County Development Plan 2017-2023. The H1 zoned lands which the new access road will service, will be the subject of separate planning applications for development(s) at future dates.

Refused0.0 km23 August 2021
FW17A/0228

Extraction with associated crushing, screening and processing of rock

Granted0.2 km15 February 2018
FW24A/0372E

Construction and operation of an aggregate processing plant to produce construction-grade sand and gravel from quarry fines / screenings generated by extraction activities at the surrounding quarry complex (previously approved under Planning Ref. FW12A/0022). AI Rcvd 20/1/2025

Granted0.2 km13 February 2025
FW19A/0226

Proposed development will consist of an extension to the site access road off the existing roundabout aqt the jct of the Kilshane Rd (L3120) & Cappagh Rd (L3080) as previously permitted under P. Ref. FW17A/0152. The new section of road will provide access to service the existing lands zoned as Heavy Industry. Provision of piers, access gates and signage.

Granted0.3 km21 February 2020
FW20A/0217

The proposed development, within the previously permitted application areas of planning ref's FW17A/0152 and FW19A/0226, will consist of temporary security controls adjacent to the Kilshane Road (L3120) and Cappagh Road (L3080) roundabout junction at the entrance to Huntstown Estate. The development within an application area of c.0.08 hectares includes for 6 no. retractable electric security bollards within the road carriageway; 8 no. demountable bollards between the footpaths/cycle-paths/grass verges; and 1 no. set of temporary automatic security gates (height c. 2.4m) located within the road carriageway.

Granted0.3 km23 February 2021
FW24A/0199E

The proposed development will consist of the construction of 3 no. enterprise / light industrial / wholesale outlet units (Units 1, 2 and 3), including ancillary office / administration areas over two levels, with a total GFA of 2,868 sq.m. The proposal includes vehicular, pedestrian and cycle access for staff, visitors and service vehicles off the existing road network serving the Business Park to the west (i.e. Kilshane Drive), with new infrastructure proposed within the application site boundary. The proposal includes 52 no. car parking spaces, 30 no. cycle spaces, an ESB Substation (GFA of 24 sq.m), signage zones for the units, delivery / loading areas, landscaping, boundary treatments, entrance gates, lighting, PV panels, foul and surface water drainage, site clearance, and all associated development. AI Rcvd 07/10/2024

Granted0.4 km31 October 2024

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required