Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Site Nos. 12 & 13, Stadium Business Park, Ballycoolin Road, Dublin 11

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

11% of nearby decided applications were refused. The preview found 3,760 nearby planning records within 5 km where a location match is available.

Matched source
FW22A/0061
Project type
One-off house
Coverage
5 km radius
3,760Nearby applications
11%Refused
3,333Conditional grants
21Refusal reasons

Top refusal reasons nearby

Visual Amenity9
Residential Amenity6
Other3
Design2
Zoning Contravention1

Nearest similar decisions

FW22A/0061

For a development comprising: (i) construction of 5 no. industrial / warehouse / logistics units contained within 3 no. blocks consisting of: (a) Block A, containing Unit 1 and Unit 2, warehousing / distribution / logistics units comprising 2,011.m each; (b) Block B, containing Unit 3 and 4, industrial / warehousing units comprising 1,381sq.m each; and Block C, containing Unit 5, a warehousing / distribution / logistics unit comprising 1,635sq.m. Each unit will be provided with ancillary office space and staff facilities; (ii) Creation of vehicular access point to the west of the site to provide for public access, repositioning of 2no. existing vehicular access points & the provision of 1 no. new vehicular access point, all 3no. access points to the north for servicing and deliveries; (iii) 135 no. car parking spaces (including 6 no. EV spaces and 5 no. reduced mobility spaces) and 80 no. bicycle parking spaces will serve the development; and (iv) The development will also include all associated SuDS drainage, landscaping, boundary treatments, lighting, CCTV, signage and site development works necessary to facilitate the development.

Granted0.0 km26 May 2022
FW24A/0481E

Stadium Business Park Investment Limited intends to apply for permission for development comprising amendments to a previously permitted development (FCC Reg. Ref. FW22A/0061) at this site, Site Nos. 12 and 13 (containing Unit Nos. 1, 2, 3, 4, and 5), Stadium Business Park, Ballycoolin Road, Dublin 11. The proposed development will consist of: minor internal amendments, alterations to elevations, and provision of PV solar panels at roof level of all 5 no. units; the removal of Automatic Opening Vents (AOVs) at Unit No. 5; provision of new pedestrian and cycle access from Ballycoolin Road; the provision of an ESB substation and switch room to the west of Unit No. 1; minor site layout changes including the part relocation of permitted car and cycle parking, and provision of new motorcycle parking, all within the southern portion of the site; hard and soft landscaping; boundary treatments; cabling and ducting; and all associated site development works above and below ground.

Granted0.0 km16 January 2025
FW22A/0151

Install 10KW of roof mounted solar panels on our unit (area of solar panels 47.7 sq.m. roof area 104.9 sq.m.) and all associate site works,

Granted0.2 km01 September 2022
FW20A/0074

3 No. 8.0m tall flagpoles in the front grass verge and all associated site works

Granted0.2 km16 July 2020
FW22A/0134

Construction of a warehouse building (ground floor 540m2 and first floor 172 m2) comprising offices, welfare facilities, workshop, storage areas, parking, storm water retention pond, facility lighting, building signage and all other associated site ancillary and infrastructure works required to make the building operational. AI received 06Oct 2022

Granted0.2 km26 October 2022
FW20A/0098

Planning Permission: New front and side ornamental boundary walls. New ground floor link building to connect 14A to 14B. New ground floor building entrance, reception, corridor, and external canopy 92sqm to 14A. New toilets at ground floor of 14A 20sqm. New mezzanine at first floor of 14B 188sqm, new external Fire Escape at 14B, 9 new windows at 14B and 2 new windows at 14A. Retention Permission: Front entrance doors to 14A, Fire Escape to 14A, 4 No. mezzanines at first and second floor to 14A total area 463sqm. Offices and display area at ground floor to 14B 266.6sqm. Office/meeting area at first floor to14B 108.6sqm. Offices at second floor to 14A 43.4sqm and 2 windows to 14A And All Associated Site Works

Granted0.2 km20 October 2020

The full report covers all 3,760 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required