Retention of restoration and alterations to a dwelling house. The extensions to a dwelling house. Permission for a new front boundary wall and associated site development works.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
The Crossroads, Cappogue, Dublin 11, D11 EA09.
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
11% of nearby decided applications were refused. The preview found 3,796 nearby planning records within 5 km where a location match is available.
- Matched source
- FW22A/0083
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Permission for the construction of 4 n o. industrial units consisting of offices, workshops and accessories, a training unit and storage, welfare facilities, parking for cars and HGV, stormwater retention pond, signage, site fencing, gates lights and all associated works. AI received 31/3/2022
Proposed development that amends the warehouse development permitted under Fingal County Council Reg ref FW21A/0149 at this site. The proposed amendments are for design alterations to the Unit D warehouse and ancillary office building and to the associated site works within the Unit D curtilage to facilitate its use as a logistics enterprise/land terminal. The proposed amendments include: Reduction in height and volume of the warehouse building (c 4,195 sqm GFA), which also accommodates the ancillary office and driver welfare facilities (c. 725sqm GFA), inclusion of protective external canopies on northwest and southeast elevations, alteration of facade design and finishes and solar PV panels on the roof of the warehouse building; Associated signage on the northeast, southeast and northwest elevations. Also reconfiguration and alteration of associated site development works including: New HGV and vehicular site entrances along northern site boundary to Ballycoolin Road with separate access points for pedestrians, cars and HGVs; Relocation of the ancillary surface car park area (64 no. car parking spaces) to the east of the warehouse, 34 no. bicycle parking spaces (total), HGV parking bays, dock levellers, wash bay, trailer yard, fuel tank, fuel pump island, ESB substation; bin stores; landscaping and boundary treatment works, plant at roof level with associated screening. Site (c.2.42 ha) at Premier Business Park, Ballycoolin Road, Dublin 11.
Install 10KW of roof mounted solar panels on our unit (area of solar panels 47.7 sq.m. roof area 104.9 sq.m.) and all associate site works,
Construction of a warehouse building (ground floor 540m2 and first floor 172 m2) comprising offices, welfare facilities, workshop, storage areas, parking, storm water retention pond, facility lighting, building signage and all other associated site ancillary and infrastructure works required to make the building operational. AI received 06Oct 2022
Construction of 1) a new security hut at the site entrance, 2) a warehouse/light industrial unit of approx. 4,743 sq.m (Unit B), 3) a warehouse/light industrial unit of approx. 5,896 sq.m. (Unit C) and 4) a warehouse/logistics unit of approx. 6,736 sq.m (Unit D), along with all associated site works, car and bicycle parking and landscaping, all on a site are of 4.89 ha. Cappoge Castle, a recorded monument is located on the site. AI received 15/12/21 CAI received 24/3/2022
Source match
Matched from public planning record FW22A/0083The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report