The proposed development will consist of the construction of an industrial development facility for the processing and distribution of fresh and used cooking oils (UCO) including ancillary offices and staff amenities, roof-mounted photovoltaic array, delivery vehicle maintenance building, external covered storage area, weighbridge, lorry wash, tank farm, fuel tanks, signage, lighting, landscaping, car/lorry/trailer parking areas, and all associated site development works. Access to the proposed development will be from the existing industrial estate road abutting the site to the west that connects to the Ballycoolin Road to the north. A Local Authority permit (Recovery Code 13) is required for the used cooking oil process. AI received 09/05/23
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Site B, Cappogue Industrial Park, Ballycoolin Road, Dublin 11
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
11% of nearby decided applications were refused. The preview found 3,938 nearby planning records within 5 km where a location match is available.
- Matched source
- FW23A/0016
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Construction of a distribution, washing and processing facility for fresh and used cooking oils; including offices, delivery vehicle maintenance, weightbridge, tank farm, lorry wash, external covered storage, signage, fuel tanks, ancillary accommodation and associated site works. Local Authority permits required for used cooking oil process, storage and transfer and for the collection, temporary storage and transfer of food waste (Class 10 operations, along with Disposal Code 15 & Recovery Code 13). AI received 22/6/2022 AI deemed significant ** Revised Public notices received 30/6/2022
Permission for development an an existing C&D waste facility. The proposed development at the 0.75 ha site is for an increase in the rate of waste acceptance and processing at the facility up to 49,500 tonnes per annum, comprising mixed construction and demoliton (C&D) wastes. The planning application is accompanied by an Environmental Impact Assessment Report.
Retention permission is being sought for 368.87m2 of floor space, including ground floor area (347.34m2) and first floor area (21.53m2) measuring a maximum height of 13.5m above ground level within the existing building permitted under previous Planning Permission FW13A/0053 and a 51 m long constructed boundary wall along the western boundary of the site consisting of a 2.7m high concrete wall with a 19m high palisade fence atop (total height 4.6m). Additional Information Lodged on 5th Dec 2019 Significant Additional Information Public Notices received on 19th Dec 2019 Clarification of Additional Information lodged on 25th March 2020
Permission for development at a parcel of Land immediately south of Ballycoolin Road ( L3080) in the townland of Cappoge between Rosemount Business Park (north) and Premier Business Park (east) ( ITM X: 710273, y:739735) for the construction and establishment of an Electric Vehicle (EV) Bus Depot. The Proposed Development forms part of the NTA's Bus Connects programme. Spanning approximately 4 hectares within an urban industrial area south of Ballycoolin Road in Cappoge, Co. Dublin, the depot will accommodate around 176 buses. The Proposed Development will also accommodate administrative offices, maintenance facilities, electrical substation, and parking spaces. In all, the Proposed Development will consist of the following: • Administrative offices (including atrium entrance) (ground floor: 1,240m2, first floor: 1,280m2, total: 2,520m2); • Vehicle washing and cleaning building (1,120m2); • Major and minor repairs and maintenance bays/workshop/stores (ground floor: 2,250m2, first floor: 430m2, total: 2,680m2); • Gate, entrance, and security hut; • Vehicle inspection bays/hut (530m2); • Electrical substation compound (2,700m2); • Seven transformer buildings at 60m2 each; • Car parking (approximately 57 standard, three accessible bays, six for motorcycle, and six for EVs), catering to diverse transportation needed (1,700m2); • Bus parking bays (176 spaces); • Cycle parking (24m2); • Architecturally designed boundary fencing: 1.8m high fence along Ballycoolin Road and 4.5m high fencing around the remainder of the site's perimeter; • Two vehicle crossings on the eastern boundary for site access; • A separate vehicle crossing for direct ESB substation access; • Minor upgrades to the public road (eastern access road) including road grading, reshaping mounding refreshing line markings, new cycle ramps and removal of barriers; • Landscaping including native tree planning/shrubs and various amenity areas and SuDS features throughout the site; • Earthworks, construction activities and all ancillary site development works. Additional Information received 19/12/25 Clarification of Additional Information received 24/02/2026
Construction of 1) a new security hut at the site entrance, 2) a warehouse/light industrial unit of approx. 4,743 sq.m (Unit B), 3) a warehouse/light industrial unit of approx. 5,896 sq.m. (Unit C) and 4) a warehouse/logistics unit of approx. 6,736 sq.m (Unit D), along with all associated site works, car and bicycle parking and landscaping, all on a site are of 4.89 ha. Cappoge Castle, a recorded monument is located on the site. AI received 15/12/21 CAI received 24/3/2022
The full report covers all 3,938 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record FW23A/0016The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report