Retention permission is sought for the following: -Provision of solar panels (with an area of c.335 sq.m in total) at roof level of the warehouse/logistics unit. -Amendments to the permitted northern boundary treatment, to comprise 1.8m high fencing atop a plinth wall, pending the delivery of future development to the north of site (under Reg. Ref.: FW22A/0066). The application site is located to the west of Kilshane Avenue, to the south of Bay Lane and is bound by greenfield lands to the west.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Unit 900, Northwest Logistics Park, (formally Northwest Business Park)
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
14% of nearby decided applications were refused. The preview found 1,876 nearby planning records within 5 km where a location match is available.
- Matched source
- FW23A/0100
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Planning permission for the retention and completion of amendments to the development permitted under Reg. Ref.: FW21A/0146 on a site to the north of Northwest Logistics Park, Ballycoolin, Dublin 15 (formerly known as Northwest Business Park). The application site is located to the west of Kilshane Avenue, to the south of Bay Lane and is bound by greenfield lands to the west. The proposed amendments relating to permitted warehouse / logistics development (Unit 900) comprise the following: • Amendments to the permitted northern security fence boundary, relocating it southwards to accommodate future development to the north of the site (under Reg. Ref.: FW22A/0066). • Provision of an access control barrier at the entrance to the development; • Amendments and rearrangement of permitted bicycle & smoking shelters due to proposed alteration to northern fence line. • Amendments to the permitted ESB substation including relocation and provision of an ESB vehicle set down area. • Amendments to the permitted plant areas: the permitted external yard plant enclosure is increased to accommodate mechanical plant requirements, and an additional electrical plant room with a gross floor area of c.115 sq.m is proposed to the southern façade of the main warehouse / logistics building. • Amendments to the permitted sprinkler tank and pump house, which are repositioned, and the sprinkler valve house area which is reduced in scale. • Amendments to perimeter footpaths along the northern and western building frontages. • Amendments to the permitted grade doors, including the omission of 1 no. grade door and repositioning of 1 no. grade door along the northern facade. • Amendments to and reconfiguration of the internal layout of the permitted warehouse / logistics unit including provision of an additional storeroom, relocation of a server room and the reconfiguration of a driver access room & pallet truck charging points. • Associated amendments to building facades, including alterations to the location of permitted green walls, and provision of an external fire escape stair to the southern façade. • Provision of a communications antenna c. 2 metres in height at roof level. • Alteration to the route of permitted underground foul sewer connection to the southwest of the site, including associated alteration to the development boundary to facilitate the alteration. • All associated and ancillary works.
The proposed development consists of the following:
The proposed development consists of the following: Construction of a high technology manufacturing unit (for the manufacturing of high technology electrical components), with a total gross floor area (GFA) of 23,6000 sq.m (including ancillary office space of 2,318 sq.m. at ground and first floor levels), and with a main parapet height of c. 12 metres and maximum height of 14.5 metres. The proposed unit will be known as Unit 901; Provision of a link corridor between the proposed high technology manufacturing unit and Unit 900 to the south (logistics/warehouse unit permitted under Reg. Ref. FW21A/0146); The provision of 562 no. car parking spaces, dedicated bus drop off and 275 no. bicycle parking spaces along with HGV loading bays and a service yard to the west of the proposed unit. The vehicular access to the unit will be provided via two entrances from the roundabout proposed under Reg. Ref. FW21A/0146, which provides access to Kilshane Avenue to the east. The development also includes rooftop plant for the proposed unit, an ESB substation with switchroom, 2 no. emergency generators, 2 no. sprinkler/water tanks and 2 no. pumphouses, 2 no. smoking shelters, bicycle shelters, landscaping, boundary treatments, entrance gates, site lighting, all associated site development works, underground foul and storm water drainage services and attenuation areas including connections to existing/permitted services infrastructure and all ancillary works. An Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the planning application and the EIAR will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority. The application site (with an area of c. 5.9 hectares) is located to the north of the warehouse/logistics development (Unit 900) permitted under Reg. Ref. FW21A/0146, to the northeast of Kilshane Avenue, to the south of Bay Lane and is bound by greenfield lands to the west.
Planning permission for the extension of the existing car park to provide additional car parking and storage/bin storage hard standing area and all associated site development works. AI Rcvd 23/08/2024
We, Earlsland Corporation Unlimited Company, intend to apply for planning permission for development on lands adjacent to Unit 900, Northwest Logistics Park, Ballycoolin, Dublin 15. The application site is located to the west of Unit 900, which is accessed from Kilshane Avenue, is situated to the south of Bay Lane, and is bound to the west by the lands where Ellipse Logistics Park is under construction. The proposed development is for an extension of the existing warehouse / logistics unit to provide an additional 9,080 sq.m of warehouse / logistics floor space, comprising one level with a maximum height of c. 17.09m. The proposal includes an extended service yard and dock levellers, plant rooms, PV panels at roof level, foul and surface water drainage, landscaping, boundary treatment, lighting and all associated works. Additional Information Received 18/07/2025 Clarification of AI received 16/10/25
The full report covers all 1,876 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record FW23A/0100The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.