PlanIntelPlanning precedent preview

Planning precedent report

Horizon Logistics Park (on lands known as Site P2), off the R108, at t

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

10% of nearby decided applications were refused. The preview found 3,128 nearby planning records within 5 km where a location match is available.

Matched source
FW23A/0250
Project type
One-off house
Coverage
5 km radius
3,128Nearby applications
10%Refused
2,822Conditional grants
4Refusal reasons

Top refusal reasons nearby

Other2
Visual Amenity2

Nearest similar decisions

FW23A/0250

The proposed development is located to the south of the development permitted under Reg. Ref.: FW20/0187 (known as the Site N development), and to the east of the Development Permitted under Reg. Ref.: FW21A/0180 (known as the Site P1 development) The proposed development consists of the following: The construction of 1 no. light industrial unit, including ancillary office use / visitor centre / staff facilities / reception areas over two levels (Unit P2) with a gross floor area (GFA) of c. 10,106 sq.m (including 1,424 sq.m of ancillary welfare, reception, visitor, and office space). The proposed building will have a main parapet height of c. 16.9 metres, and c. 9.2 metres for the office / reception areas. Provision of 105 no. car parking spaces, including disabled parking spaces, electrical parking spaces, bicycle parking spaces within bicycle shelter structures (102 no.), and motorcycle spaces; Provision of an ESB substation and switchroom (with a GFA of c. 35.8 sq.m) to the northeast of the main light industrial building, Provision of a service yard and loading bays to the west of the main light industrial unit. Provision of 2 no. sprinkler tanks, a pumphouse (with a GFA of c. 30 sq.m), a storeroom with a GFA of c. 37.4 sq. m, a recycling, and bin store to the west of the proposed service yard. Provision of access arrangements to the proposed development including an access from the estate road to the east of the site, and grasscrete fire tender road to the north of Unit P2. Provision of signage zones on the proposed light industrial unit and signage to include 2 no. stand-alone totem signs associated with the proposed unit and a flagpole located along the eastern boundary. Provision an additional area of integrated constructed wetland to the east of the main application site area, including connections to the proposed drainage network for Unit P2. The proposal includes landscaping and planting, PV panel zones at roof level, boundary treatments, plant within screened plant areas, site lighting, security fencing and gates, and all associated site services and development works, including underground foul and storm water drainage network and sustainable urban drainage systems. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the planning application. AI rcvd 20/10/2023

Granted0.0 km12 December 2023
FW20A/0187

The proposed development consists of the following: The construction of 8 no. light industrial/warehouse (including wholesale use) / logistics units including ancillary office use and entrance/reception areas over two levels, with maximum height of c. 15.5 m and combined total gross floor area (GFA) of 39,732 sq.m. (units N1-N8); The demolition of 2 no. existing agricultural sheds and the construction of a link road (Estate Road No. 4), extending south from the proposed development to connect with existing road infrastructure (Sillogue Green); The implementation of a new internal road network with all access points, internal access roads and footpaths, service yards and access roads, cycle paths and landscaping; The construction of 2 no. new roundabouts on Estate Road No. 4, the construction of Estate Road No. 3 branching west and the extension of Estate Road No. 2 which currently serves Horizon Logistics Park; The development includes 2 no. ESB substation buildings and switchrooms (with a combined GFA of 68 sq.m.), service yards including loading bays, bin storage areas and a total of 395 no. car parking spaces, 8 no. motorcycle parking spaces and 202 no. cycle parking spaces; The proposal includes landscaping and planting, boundary treatment, lighting, security fencing and all associated site services and development works including underground foul and storm water drainage network and sustainable urban drainage systems, all on a site of 14.64 hectares. A Natura Impact Statement will be submitted to the Planning Authority with the planning application. AI received 20/04/21 AI deemed significant 22/04/21 Revised notices received 30/04/21

Granted0.3 km23 June 2021
FW25A/0055E

Permission is sought for the following proposed development: The construction of 5 no. light industrial / warehouse (including wholesale use) / logistics units, including entrance / reception areas and ancillary office space, and 1 no. café / retail unit with associated seating. The proposed units will have an overall combined total gross floor area (GFA) of c. 38,156 sq.m (along with ancillary ESB substations and pumphouses with a combined GFA of 582.4 sq.m.), on a site of c. 14.2 Ha. The proposed development consists of the following at Site F: • The construction of 1 no. light industrial/warehouse (including wholesale use) / logistics building (Unit F2) with a GFA of c. 7,795 sq.m (including welfare and reception areas and ancillary office space of c. 669 sq.m over two levels). The proposed building will have a maximum height of c. 15.7 metres. • Provision of 53 no. car parking spaces, 6 no. motorbike parking spaces and 85 no. cycle parking spaces. • Provision of an ESB substation and switchroom, sprinkler tank and pumphouse, bin store and recycle store. • Provision of a service yard and HGV loading/unloading areas, with associated loading bays to the southeast of the building. • Provision of signage and access arrangements including an access road to the north. The proposed development consists of the following at Site G: • The construction of 1 no. light industrial/warehouse (including wholesale use) / logistics building (Unit G2) with a GFA of c. 8,133 sq.m (including welfare and reception areas over two levels and c. 546 sq.m of ancillary office space). The proposed building will have a maximum height of c. 15.3 metres. • Provision of 50 no. car parking spaces, 5 no. motorbike parking spaces and 80 no. cycle parking spaces. • Provision of a sprinkler tank and pumphouse, bin store, and recycle store. • Provision of a service yard and HGV loading/unloading areas, with associated loading bays to the east of the building. • Provision of signage, access arrangements to the proposed development including an access from the existing estate road to the west. The proposed development consists of the following at Site H: • The construction of 2 no. light industrial/warehouse (including wholesale use) / logistics buildings (Units H1 and H2) with a GFA of 8,622 sq.m and 9,070 sq.m. respectively (including welfare and reception areas over two levels for each building and ancillary office space of c. 479 sq.m. and c. 485 sq.m respectively). The proposed buildings will have a maximum height of c. 14.8 metres. • Provision of 100 no. car parking spaces (50 no. for each unit) 10 no. motorbike parking spaces (5 no. for each unit) and 32 no. bicycle parking spaces (16 no. for each unit). • Provision of an ESB substation and switch room, 2 no. sprinkler tanks, 2 no. pumprooms, bin stores, and recycle stores. • Provision of service yards and HGV loading/unloading areas, with associated loading bays to the east of the proposed light industrial/warehouse/logistics buildings. • Provision of signage, access arrangements to the proposed development including accesses from the existing estate road to the west. The proposed development consists of the following at Site P: • The construction of 1 no. light industrial/warehouse (including wholesale use) / logistics building and 1 no. café/retail building accommodating one retail unit and one café unit (Units P3 and P4) with a gross internal area (GIA) of 4,031 sq.m and 505 sq.m. respectively (including welfare and reception areas over two levels and ancillary office space of c. 481 sq.m. within Unit P3). Unit P3 will have a maximum height of c. 14.7 metres and Unit P4 will have a maximum height of c. 4.8 metres. • Provision of 60 no. car parking spaces (40 no. for Unit P3 and 20 no. for Unit P4), 6 no. motorbike parking spaces (4 no. for Unit P3 and 2 no. for Unit P4) and 66 no. bicycle parking spaces. • Provision of an ESB substation and switchroom, a sprinkler tank, pumproom, bin stores and recycle stores. • Provision of a service yard and HGV loading/unloading area, with associated loading bays to the west of the proposed light industrial/warehouse/logistics building. • Provision of signage, access arrangements to the proposed development including accesses from adjacent estate roads to the north and east. The proposal includes provision of a new roundabout at the west of the existing logistics park (northwest of Unit P1), landscaping and planting, PV panel zones at roof level, public art, boundary treatments, signage zones, site lighting, boundary treatments, and all associated site services and development works, including underground foul and storm water drainage network and sustainable urban drainage systems. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) will be submitted to the Planning Authority with the planning application and the EIAR and NIS will be available for inspection or purchase for a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority. Additional Information Received 04/07/2025

Granted0.3 km26 August 2025
FW21A/0180

The proposed development consists of the following: The construction of 1 no. light industrial/warehouse (including wholesale use) / logistics building (Unit P1) with a gross floor area (GFA) of 6,593 sq.m. (including 1,064 sq.m. o ancillary office space and reception areas over two levels). The proposed building will have a maximum height of 11 metres. Provision of 66 no. car parking spaces, 2 no. motorbike parking spaces, 33 no. bicycle parking spaces, 26 no. van parking spaces, and 30 no. HGV parking spaces. Provision of an ESB substation and switchroom (36m2), security hut (18m2) 3 no. cycle shelter structures, 2 no. smoking shelters, bin store (10m2), recycling store (17m2), a standalone maintenance/services building (67m2). Provision of service yard and HGV and van loading/unloading areas with associated loading bays to the north, south and west of the proposed warehouse/logistics building. Provision of access arrangements to the proposed development including an extension of permitted Estate Road Number 2, connecting to the road infrastructure permitted under Reg Ref FW20A/0187, along with pedestrian/cycle infrastructure to Estate Roads Number 2 and 3. Provision of signage zones and stand-alone totem sign associate with the proposed unit. The proposal includes landscaping and planting, boundary treatments, site lighting, 3 no. flag poles, security fencing and gates, and all associated site services and development works including underground foul and storm water draingage network and sustainable urban drainage systems. The proposed development is located to the sought of the development permitted under Reg. Ref. FW20A/0187 (known as Site N development). A Natura Impact Statement (NIS) will be submitted to the Planning Authority with this planning application. AI received 20/12/21

Granted0.3 km22 February 2022
FW23A/0278

A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the planning application and the NIS will be available for inspection or purchase for a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority We, HPREF Dublin Office DevCo 1 Limited, intend to apply for planning permission for development at Horizon Logistics Park (known as Site G1), off the R108, at the townlands of Silloge and Harristown, St. Margaret's, Swords, Co. Dublin. The proposed development is located to the east of the development permitted under Reg. Ref.: FW20A/0187 (known as the Site N development), and to the southwest of the Harristown Bus Depot. The proposed development consists of the following: o The construction of 1 no. light industrial / warehouse (including wholesale use) / logistics building (Unit G1) with a gross floor area (GFA) of c. 4,203 sq.m (including 656 sq.m of ancillary welfare and office space over two levels). The proposed building will have a main parapet height of c. 14.8 metres. o Provision of 44 no. car parking spaces (including 3 no. disabled parking spaces and 5 no. electrical vehicle parking spaces), 44 no. bicycle parking spaces within bicycle shelter structures, and 5 no. motorcycle spaces; o Provision of an ESB substation (with a GA of c. 35.75 sq.m) to the southeast of the main building. • Provision of a service yard and loading bays to the east of the main building, bound by a 2.4m high fence. Provision of a recycling and bin store to the south of the service yard. Provision of access arrangements to the proposed development including an access from the estate road to the west of the site and provision of new cycle and pedestrian path alongside the estate road. Provision of landscaping and amenity space to the north and east of the site, planting, and boundary treatments. The proposal includes signage zones, PV panel zones at roof level, building plant, site lighting, security fencing, and all associated site services and development works, including underground foul and storm water drainage network and sustainable urban drainage systems

Granted0.4 km10 November 2023
FW23A/0259

The development will consist of the following:

Granted0.4 km23 October 2023

The full report covers all 3,128 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required