Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Bay Lane, Kilshane, Dublin 11

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

14% of nearby decided applications were refused. The preview found 1,769 nearby planning records within 5 km where a location match is available.

Matched source
FW25A/0367E
Project type
One-off house
Coverage
5 km radius
1,769Nearby applications
14%Refused
1,523Conditional grants
11Refusal reasons

Top refusal reasons nearby

Visual Amenity4
Other3
Residential Amenity3
Design1

Nearest similar decisions

FW25A/0367E

Planning permission is sought for: • Demolition of an existing vacant dwelling house (with a maximum height of c. 5.4m) located in the southern portion of the Site. • Demolition of an existing outbuilding (with a maximum height of c. 6.5m) located in the northeastern portion of the Site. • Demolition of an existing gateway located at the southern site boundary and extension of fence to close the existing entrance. • Associated and ancillary site clearance works to make the site ready for potential future development.

Granted0.0 km22 October 2025
FW25A/0515E

The proposed development consists of an extension of an existing Block Valve located at West Business Park, Blanchardstown, Dublin 15. The extension will consist of a concrete base for Temporary Pig Trap, an Asphalt Access Road, an internal Concrete Road, a 2.4m high Security Fence and all ancillary services and associated site works. An Environmental Impact Assessment Report (EIAR) has been prepared with respect to the project and will be submitted with the application.

Granted0.1 km04 February 2026
FW22A/0066

The proposed development consists of the following: Construction of a high technology manufacturing unit (for the manufacturing of high technology electrical components), with a total gross floor area (GFA) of 23,6000 sq.m (including ancillary office space of 2,318 sq.m. at ground and first floor levels), and with a main parapet height of c. 12 metres and maximum height of 14.5 metres. The proposed unit will be known as Unit 901; Provision of a link corridor between the proposed high technology manufacturing unit and Unit 900 to the south (logistics/warehouse unit permitted under Reg. Ref. FW21A/0146); The provision of 562 no. car parking spaces, dedicated bus drop off and 275 no. bicycle parking spaces along with HGV loading bays and a service yard to the west of the proposed unit. The vehicular access to the unit will be provided via two entrances from the roundabout proposed under Reg. Ref. FW21A/0146, which provides access to Kilshane Avenue to the east. The development also includes rooftop plant for the proposed unit, an ESB substation with switchroom, 2 no. emergency generators, 2 no. sprinkler/water tanks and 2 no. pumphouses, 2 no. smoking shelters, bicycle shelters, landscaping, boundary treatments, entrance gates, site lighting, all associated site development works, underground foul and storm water drainage services and attenuation areas including connections to existing/permitted services infrastructure and all ancillary works. An Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the planning application and the EIAR will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority. The application site (with an area of c. 5.9 hectares) is located to the north of the warehouse/logistics development (Unit 900) permitted under Reg. Ref. FW21A/0146, to the northeast of Kilshane Avenue, to the south of Bay Lane and is bound by greenfield lands to the west.

Granted0.3 km01 June 2022
FW17A/0238

Single storey extension (85 sq. m.) to rear of existing industrial bui

Granted0.3 km27 February 2018
FW21A/0146

The proposed development consists of the following:

Granted0.3 km06 January 2022
FW22A/0142

Planning permission for the retention and completion of amendments to the development permitted under Reg. Ref.: FW21A/0146 on a site to the north of Northwest Logistics Park, Ballycoolin, Dublin 15 (formerly known as Northwest Business Park). The application site is located to the west of Kilshane Avenue, to the south of Bay Lane and is bound by greenfield lands to the west. The proposed amendments relating to permitted warehouse / logistics development (Unit 900) comprise the following: • Amendments to the permitted northern security fence boundary, relocating it southwards to accommodate future development to the north of the site (under Reg. Ref.: FW22A/0066). • Provision of an access control barrier at the entrance to the development; • Amendments and rearrangement of permitted bicycle & smoking shelters due to proposed alteration to northern fence line. • Amendments to the permitted ESB substation including relocation and provision of an ESB vehicle set down area. • Amendments to the permitted plant areas: the permitted external yard plant enclosure is increased to accommodate mechanical plant requirements, and an additional electrical plant room with a gross floor area of c.115 sq.m is proposed to the southern façade of the main warehouse / logistics building. • Amendments to the permitted sprinkler tank and pump house, which are repositioned, and the sprinkler valve house area which is reduced in scale. • Amendments to perimeter footpaths along the northern and western building frontages. • Amendments to the permitted grade doors, including the omission of 1 no. grade door and repositioning of 1 no. grade door along the northern facade. • Amendments to and reconfiguration of the internal layout of the permitted warehouse / logistics unit including provision of an additional storeroom, relocation of a server room and the reconfiguration of a driver access room & pallet truck charging points. • Associated amendments to building facades, including alterations to the location of permitted green walls, and provision of an external fire escape stair to the southern façade. • Provision of a communications antenna c. 2 metres in height at roof level. • Alteration to the route of permitted underground foul sewer connection to the southwest of the site, including associated alteration to the development boundary to facilitate the alteration. • All associated and ancillary works.

Granted0.3 km05 September 2022

The full report covers all 1,769 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required